My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technics lKc. <br /> lKansas Avenue <br /> Modesto,California 95351 <br /> (209)522-4119/Fax(209)522-4227 <br /> March 13, 2012 RECEIVED <br /> Project No.: 507.2 MAR 15 2W <br /> Project Name: J.M. Equipment (Charter Way) ENVIRONMENTAL <br /> PERMIT/SERVICES <br /> Catherine Kahler <br /> J.M. Equipment <br /> 321 Spreckels Avenue <br /> Manteca, CA 95336 <br /> George Betker <br /> Geo Properties Inc. <br /> 2306 Jackie Court <br /> Oakdale, CA 95361 <br /> RE: Report— 1St Quarter 2012 Groundwater Monitoring <br /> J.M. Equipment, 1245 W. Charter Way, Stockton, CA <br /> Dear Ms. Kahler and Mr. Betker: <br /> Geological Technics Inc. has prepared a Groundwater Monitoring Report for the 1St Quarter 2012 <br /> in letter format, in compliance with C.C.R. Title 23, Division 3, Chapter 16 Section 2652. This <br /> quarterly report summarizes activities for the 1st quarter of 2012, and outlines the next proposed <br /> sampling and analysis event. <br /> 1st Quarter 2012 Activities <br /> GTI implemented Phase I activities during the 1St Quarter of 2012, including groundwater <br /> monitoring and sampling of the sites seven treatment zone, transition zone and compliance wells. <br /> It is anticipated that Phase I activities will continue until the 3d Quarter of 2012 and that the <br /> findings will be presented in a Phase I Remedial Action Summary Report and Second RAP <br /> Addendum, which will include a summary of the monitoring results (field and laboratory data), <br /> an evaluation of the enhancement methods, and a specific discussion of Phase H implementation. <br /> 1"QMR 12 letter format 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.