My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JM Equipment Co. • - 3 - • April 2012 <br /> of the former USTs, monitoring wells and historic groundwater gradients is provided at the end <br /> of this five year summary. <br /> Remediation Summary <br /> • Free Product: No free product was documented throughout the life of this case. <br /> • Soil Excavation: Unknown. <br /> • In-Situ Soil Remediation: No soil remediation has been conducted. <br /> • Groundwater Remediation: Groundwater remediation reportedly delayed by 2011-2012 <br /> Cleanup Fund budget. Air sparging pilot test, conducted September 2011 through <br /> present. In-situ chemical oxidation by H2O2 injection pilot test, conducted September <br /> 2011 through present, and by ORC socks, conducted September 2011 through present. <br /> General Site Conditions <br /> • Geology and Hydrogeology: The Site is underlain by interbedded and intermixed sand, <br /> silt and clay. The depth to groundwater is approximately 13 feet bgs and the <br /> groundwater gradient is northeast at approximately 0.0006 ft/ft. <br /> • Residual Mass: Soil, 1658 gallons of TPHg; Groundwater, 64 gallons of TPHg. WOO <br /> will be achieved in 138 years by natural attenuation (GTI June 2009). <br /> • Groundwater Trends: There are more than 12 years of groundwater monitoring data for <br /> this Site. Benzene trends are shown below, source area (MW-9), near down gradient <br /> (MW-8) and far down gradient (MW-2). <br /> BENZENE Results for MW-9 <br /> 36000. <br /> 30000 <br /> _-� ; <br /> 20000 <br /> moo° <br /> soon <br /> of <br /> ,✓ I <br /> BENZENE Trene <br /> BENZENE R...It.for MW-8 <br /> w <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.