My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C7ealogical Technics Inc. <br /> 11017"street <br /> Modesto,California 95354 <br /> ' (209)522-4119/Fax#522-4227 <br /> 1 October 1, 2007 <br /> Project No.: 507.2 <br /> Project Name: J.M. Equip. (Charter Way) <br /> Catherine Kahler <br /> Geo Corp. <br /> c/o J.M. Equipment Co., Inc. <br /> 819 S. 9a' Street <br /> Modesto, CA 95351 <br /> ' Re: Work Plan—Soil Boring Investigation <br /> J.M. Equipment, 1245 W. Charter Way, Stockton, CA <br /> iDear Ms. Kahler: <br /> Geological Technics Inc. is pleased to submit the following Soil Boring Investigation work <br /> plan. This plan is intended to satisfy San Joaquin County directives to perform additional site <br /> characterization to the north of the former UST location. Soil and groundwater samples will <br /> be obtained from two direct push soil borings and submitted for laboratory analysis. Based <br /> ' on the results of the field investigation, the Site Conceptual Model will be updated and a <br /> Corrective Action Plan (CAP) developed. <br /> If you have any questions or need additional information, please contact me. <br /> Respectfully submitted, 1�-- <br /> 1 14�0 <br /> Raynold I. Kablanow II, Ph.D. <br /> Vice President <br /> cc: Mike Infurna- SIC PHS/EHD <br /> James Barton - CRWQCB-CVR <br /> USTCFP <br />
The URL can be used to link to this page
Your browser does not support the video tag.