My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 6:50:45 PM
Creation date
3/6/2019 3:50:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
489
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> CTe0logicaI Te Mics 19c. <br /> 1101 7'"Street <br /> Modesto,Califomia 45354 <br /> (209)522-4119/Fax(209 522-4227 <br /> May 16, 2005 <br /> Project No.: 507.2 <br /> Project Name: J.M. Ec nip. (Charter Way) <br /> Ms. Catherine Kahler <br /> Geo Corp. <br /> c/o J.M. Equipment Co., I ic. <br /> 819 S. 9a' Street <br /> Modesto, Ca 95351 <br /> RE: Work Plan: Additi nal Site Characterization,Addendum#1 <br /> J.M. Equipment, 1 45 W. Charter Way, Stockton, CA <br /> Dear Ms. Kahler: <br /> Geological Technics Inc. TI) submitted our March 10, 2005 "Additional Site Characterization" <br /> work plan to San Joaquia County Public Health Department/Environmental Health Division <br /> (SJC PHS/EHD) for review, comment and approval. SJC PHS/EHD issued an April 15, 2005 <br /> correspondence that requested additional information and denied approval of the work plan. <br /> GTI has produced this adc endum to our work plan to addresses the points in the SJC PHS/EHD <br /> letter(copy attached) in lil a numbered sequence: <br /> 1) SJC PHS/EHD comm nt: <br /> "What was length of...hos ... inserted " into the injection well? <br /> GTI response: The lengt i of the hose was —40' to allow the injection to take place across the <br /> full length of MW-9's well screen (15 — 35'). It's length allowed five feet above grade to be <br /> attached to pump, cylind r or ozone generator. As stated in Applied Process Technology's <br /> (APT) September 20, 2001 pilot test report—page 4, section 4.4, the injection depths (bottom of <br /> the inserted hose) ranged from 15 to 35 feet below grade surface (bgs). APT started with the <br /> hose at the bottom of the N iell (ascertained by feel and hose length) and slowly withdrew the hose <br /> over the injection period to the shallower impact depths. <br /> 2) SJC PHS/EHD comm nt: <br /> "How did GTI verify that i iater vacated the well...?" <br />
The URL can be used to link to this page
Your browser does not support the video tag.