Laserfiche WebLink
G¢olagicalTecknics!u Page <br /> J.M. Equipment <br /> Project 507.2 <br /> October 20,2003 <br /> The following suppoi ting documents are attached: <br /> ■ September 20, 20 2 "In-Situ Remediation" Feasibility Study <br /> ■ January 15, 2003 `Addendum—In-Situ Remediation Feasibility Study" <br /> ■ June 10, 2003 "P'iot Test for In-Situ Remediation"work plan <br /> ■ Bids from subcon xactors. <br /> ■ Itemized spreads eet of costs for performing this work. <br /> • . San Joaquin Cour ty correspondence. <br /> Proposed Bidding o Pro'ect <br /> To remain in compli nice with the USTCFP, Geological Technics Inc. requested numerous <br /> companies to prepare bids for drilling and field support. Bids are included for: <br /> • WellInstallat n; <br /> • Groundwater nonitoring and sampling; <br /> • Laboratory A alyses; <br /> • Pilot Test Inj tion Services <br /> The opinion of cost readsheet is attached and shows itemized costs for the proposed tasks. <br /> In an attempt to mak this Pre-Approval flow smoothly, we have used the same unit costs for <br /> this work that has previously been approved by the USTCFP. <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. <br /> Tentative Schedule I or Implementing Work <br /> Task Description Schedule <br /> • Submit Cost Pre- pproval Oct. 2003 <br /> • Receive Cost Pre Approval from USTCFP Nov. 2003 <br /> • Drill& Install M4 nitoring Wells Dec. 2003 <br /> • Perform 8 Cycles of Injection Jan.04-May04 <br /> • Perform Ground rater Monitoring (6 events) Jan. 04—Jun. 04 <br /> • Submit Pilot Test Report and Remedial Action Plan June 2004 <br /> Thank you for youi attention to this project. Call me if you have questions or need <br /> clarification. <br /> Respectfully Submit <br /> Raynold I. Kablanom II, Ph.D. <br /> Cc: Ms. Nancy Nelson <br /> Gordon Bog - CRWQCB-CVR <br /> USTCFP <br />