Laserfiche WebLink
RE#;ED AN 2 8 19 <br /> State Water Resources Control Board <br /> Division of Clean Water Programs <br /> Winston H.Hickox 2014 T Street•Sacramento,California 95814•(916)227-4336 <br /> Secretaryfor Mi ifing Address: P.O.Box 944212-Sacramento,California•94244-2120 Gray Davis <br /> Environmental <br /> FAX( 16)227-4530•Internet Address: http://www.swreb.ca.gov/—cwphome/ustef Governor <br /> Protection <br /> June 25, 1999 <br /> Nancy Nelson <br /> JM Equipment Co., Inc. <br /> 819 9th St S <br /> Modesto, CA 95351 <br /> PRE-APPROVAL OFC RRECTIVE ACTION COSTS, CLAIM NO. 012607, <br /> SITE ADDRESS: 1245 HARTER WAY W, STOCKTON, CA 95206 <br /> I have reviewed your re est, received on June 24, 1999,for pre-approval of corrective action <br /> costs; I will place these d Dcuments in your file for future reference. I have included a copy of the <br /> "Cost Pre-Approval Req est"form;please use this form in the future for requesting pre-approval <br /> of corrective actions cos . <br /> With the following prod 3ions,the total cost pre-approved as eligible for reimbursement for <br /> completing the Geologic il Technics,Inc. soil cuttings &purge water disposal approved by the <br /> San Joaquin County E (County) is $2,330.00; see the table below for a breakdown of costs. <br /> (The total amount appro ed for payment through request number 1 for work at your site that has <br /> been directed and approN ed by the County is $ 1,907.) <br /> Be aware that this pre-a)proval does not constitute a decision on reimbursement: all <br /> reasonable and necessai y corrective action costs for work directed and approved by the County <br /> will be eligible for reimb ursementper the terms of your Letter of Commitment at costs consistent <br /> with those pre-approved in this letter. <br /> All future costs or corrective action must be approved in writing by Fund staff. <br /> Future c ostsfor corrective action must meet the requirements of <br /> Article 1 f, Chapter 16, Underground Storage Tank Regulations. <br /> COST PRE-APPROVAL BREAKDOWN <br /> Task Amount Pre-Approved Comments <br /> 210: Project Preparation 350.00 <br /> 240driterim Site Work 1,775.00 <br /> 260: Lab Analysis 105.00 <br /> 270: Project Manageme t 100.00 <br /> California Environmental Protection Agency <br /> Co' Recycled Paper <br />