Laserfiche WebLink
Geolaykaf?edwics Enc. Page 2 <br /> Geo Corp <br /> Project No.: 425.2 <br /> June 12, 1997 <br /> Proposed Direction of P o'ect <br /> The work approved by th County is summarized below: <br /> 1. Drill and install 3 gr undwater monitoring wells to a depth of 30 feet to define the lateral <br /> extent of groundwatei impacted by the gasoline. The vertical extent of contamination will be <br /> addressed after this w rk has been performed. <br /> 2. Drill and install 5 sod boring to a depth of 20 feet to define the extent of soil impacted by <br /> gasoline. The borehi iles are to be converted to vapor extraction wells for use during the <br /> remedial phase of wet . <br /> 3. Perform soil and grou idwater testing for TPH-G, BTEX, MTBE. <br /> 4. Place wells on a q rly monitoring schedule for one year. <br /> Listed below is a propose I schedule for implementing this project. <br /> Proposed Bidding of Pr 'ect <br /> To remain in compliance with the USTCFP, Geological Technics Inc. requested V&W Drilling <br /> to drill and install 3 groundwater monitoring wells. GTI has found V&W to be very cost <br /> effective for three prim reasons: <br /> • reasonable charge ra e, <br /> • fast drilling equipment, <br /> • well trained crew. <br /> These costs have been i luded in our budget spread sheet prepared giving estimated costs for <br /> performing the work ap roved by SCDER. The budget spread sheet is attached and shows <br /> itemized cost for the tas s proposed. In an attempt to make this Pre-Approval flow smoothly, <br /> GTI has used the same unit costs for this work that has previously been approved by the <br /> USTCFP for other projec s. <br /> Geological Technics Inc . accepts field support services and lab invoices and adds a 15% <br /> overhead fee. GTI then pays these charges. Construction contractors will invoice Geo Corp. <br /> directly since Geological rechnics Inc. is not a licensed contractor. <br /> Tentative Schedule for I mnlementineWork <br /> Task Descriation Schedule <br /> • Receive directive fro CRWQCB-CVR for corrective action work Nov 1, 1996 <br /> • Submit Site Charactei ization Work Plan& Addendum Apr 4, 1997 <br /> • Receive written apprc val of work& addendum from SJCEHD Apr 9, 1997 <br /> • Prepare USTCFP Co5 t Pre-Approval for work Jun 12, 1997 <br /> • Receive approval of c Dsts from USTCFP Jun 30, 1997 <br /> • Drill and install the 3 MW's& 5-SB's Jul 9-13, 1997 <br /> • Perform Summer G monitoring event Jul 20, 1997 <br /> • Prepare a Site Charac erization Report Aug 25, 1997 <br /> Thank you for your atten ion to this project. Call me if you have questions or need clarification. <br /> My phone number is (20 9) 538-6424. <br />