My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001030
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1245
>
3500 - Local Oversight Program
>
PR0544236
>
ARCHIVED REPORTS XR0001030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 8:34:05 PM
Creation date
3/6/2019 4:12:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001030
RECORD_ID
PR0544236
PE
3526
FACILITY_ID
FA0024238
FACILITY_NAME
JM EQUIPMENT COMPANY
STREET_NUMBER
1245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323034
CURRENT_STATUS
02
SITE_LOCATION
1245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geologicaf TechnWks Inc. <br /> 2741 94 ver qad <br /> Modesto,Carfornia 95351 <br /> (209)538 6424/Tar,#.538-5852 <br /> REPORT , <br /> Groundwater Monitoring <br /> 4t" Quarter 2000 <br /> J.M. Equipment Company <br /> 1245 West Charter Way <br /> Stockton, California <br /> Project No 507 2 <br /> March 12, 2001 <br /> EXECUTIVE SUMMARY <br /> This report summarizes the 4"' Quarter 2000 round of groundwater monitoring and testing <br /> that took place on January 5, 2001 The analytical results of groundwater samples show that <br /> detectable concentrations of BTEX and TPH-G were present in five of eight groundwater <br /> monitoring wells The magnitude of the contamination in the wells is consistent with <br /> historical site data The fuel oxygenate compound MTBE was detected in two of the eight <br /> wells <br /> On January 5, 2001, the average depth to groundwater at the site was 14 94 feet bgs and the <br /> groundwater flow was N36°E at 0 003 ft/ft GTI has submitted a work plan for additional <br /> site characterization, which has been approved by San Joaquin County PHS/EHD The <br /> USTCFP has approved the cost of the project and the work is being established - <br /> 1.0 GROUNDWATER MONITORING <br /> 1.1 Hydrogeology of Site <br /> The geology of the site is predominately clays and sandy clays with lesser amounts of silts <br /> • and sands The average groundwater elevation was —7 48 feet below MSL on January 5, <br /> 2001 MSL is approximately 7 37 feet below ground surface <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.