' GelogkTicurinPage 7
<br /> 2nd Quarter 2004 Groundwater Monitoring Report
<br /> Project No 507 2
<br /> August 30,2004
<br />' 4.0 PILOT TEST UPDATE
<br />' In accordance with our June 10, 2003 "In-Situ Remediation Pilot Test" work plan GTT
<br /> mobilized to the site on March 19, 2004 GTI supervised Applied Process Technologies, Inc
<br /> staff's injection of a dilute hydrogen peroxide solution into well MW-9 This process
<br />' occurred on a biweekly basis thereafter and continued for eight events A final follow-up
<br /> monitoring event took place on July 8, 2004 The following table shows the pre-injection
<br /> analytical data for March 19, 2004 and the resulting test data from infection wells MW-9 and
<br />' discrete monitoring points GP-1 through GP-3 Micro-wells (314" PVC) GP-1 through GP-3
<br /> are located down gradient from MW-9 at distances of approximately 12, 24 and 36 inches,
<br /> respectively
<br />' Wells DateRBne Toluene EthylTotal TPW MTBE
<br /> u L Benzene Xylenes Gasoline ugtL
<br />' u u L u L
<br /> MW-9 03/19/04 9,210 3,640 14,000 137,000
<br /> 04/02/0 8,270 2,020 14,500 117,000 469
<br /> 04/16/00 2 220 5 260 7 770 64,000 405
<br /> 04/28/00 4 420 683 8 630 67,900 392
<br /> 05/14/00 3 820 928 6,810 67,900 387
<br /> 05/26/00 3 830 983 7150 71 000 329
<br /> 920 06/11/00 5 890 1 280 5 930 101 000 408
<br /> 1340 06/11/0 140 481 186 2,100 244
<br /> 920 06/25/04 12,100 1 3,690 907 5,750 60,400 294
<br /> 1305 06/25/04 240 736 203 690 1,170 155
<br /> 07/08/04 12,400 3,930 946 5,980 61,600 622
<br /> GP-1 03/19/04 27,200 12,600 4,180 18,700 139,000
<br /> 04/02/04 24,300 10,100 2,030 18,900 127,000 518
<br /> 04/16/04 21,400 6,690 1,450 12,100 105,000 573
<br /> 04/28/04 13,100 3,490 961 9,110 66,200 552
<br /> 05/14/04 17,500 6,710 1,630 10,8W 901100 451
<br /> 05/26/04 15,400 4,770 1,070 7,570 74,300 405
<br /> 06/11/04 18,200 7,520 1,240 9,400 109 000 486
<br />' 06/25/04 13,600 5,110 1,110 7,290 71,400 310
<br /> 07/08/04 13,200 5,440 1,290 7,630 77,500 211
<br /> GP-2 03/19/04 22,500 9,490 5,010 24,500 199,000
<br /> 04/02/04 22 B00 9,900 5,2G0 25,000 197,000 AID <200
<br /> 04/16/04 22,400 10,900 4,350 20,800 140,000 261
<br /> 04/28/04 23,200 10,600 3,960 20,400 177,000 432
<br />' 05/14/04 21,500 10,700 3,610 18,900 166,000 376
<br /> 05/26/04 19,800 9,040 2,740 17,800 135,000 242
<br /> 06/11/04 18,600 9,330 2,670 16,700 151,000 271
<br /> 06/25/04 19,000 0,440 2,740 18,500 189 000 296
<br />' 07/08/04 19,600 7,730 2,590 18140D 152,000 299
<br /> 1
<br />
|