Laserfiche WebLink
' Creolo ica[Teclutfcslnc Page 8 <br /> g <br /> 2nd Quarter 2004 Groundwater Monitoring Report <br /> Project No 547 2 <br /> August 30,2004 <br /> w <br /> Wells Date Benzene Toluene Ethyl Total TPH MTBE <br /> u u L Benzene Xytenes Gasoline u L <br /> u L <br /> GP-3 03/19/04 13 900 393 258 8,110 85.4W <br /> 04/02/04 13,900 600 3,930 13,800 128,000 395 <br />' 04/16/04 14 00 000 575 3 490 8 860 78 9 331 <br /> 04/28/04 29 900 628 2 40 <br /> 750 7,5 84,300 459 <br /> 05/14/04iil 13,700 778 3,670... 10,400 91.900 327 <br /> 05/26/04 16,100 1,280 3,720 11,800 92 400 347 <br />' 06/11/04 16,400 1,540 3,390 9,770 106 000 412 <br /> 06/25/04 15 400 1,860 3,410 9,930 110,000 256 <br /> 07/08/04 13,800 843 4,020 13,300 143,000 247 <br /> The data indicate that NIW-9 has experienced a significant reduction in contaminant <br /> concentrations since the infection process started This is expected since it is the injection <br /> point The reduction in the three mucro-wells is less but measurable but the initial results <br /> show promise for this remedial technology The significant rise in TPH concentrations in <br /> ' GP-3 suggests that the infected oxidant initially caused a release of sorbed gasoline from the <br /> soil <br /> A report on the pilot test is under development <br /> 5.0 LIMITATIONS <br /> This report was prepared in accordance with the generally accepted standard of care and <br /> ' practice in effect at the time Services were rendered It should be recognized that definition <br /> and evaluation of environmental conditions is an inexact science and that the state or practice <br /> of environmental geology/hydrology is changing and evolving and that standards existing at <br /> ' the present time may change as knowledge increases and the state of the practice continues to <br /> improve Further, that diffenng subsurface soil characteristics can be experienced within a <br /> small distance and therefore cannot be known in an absolute sense All conclusions and <br /> ' recommendations are based on the available data and information. <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> ' local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br /> 1 <br />