Laserfiche WebLink
C?C0beccal Tecknus lnc Page 10 <br /> In Situ Remediation <br /> Pilot Test Work Plan <br /> Project No 507 2 <br /> June 10,2003 <br /> Besides optimizing the chemical reaction process for hydrocarbon destruction, determining <br />' the radius of influence of the infection process into well MW-9 is another desired result of <br /> the pilot test This data will allow the development of a grid spacing of injection points to <br /> fully remediate the entire core of the residual contamination remaining at the site The <br />' chemical process evaluation and infection grid spacing will be included in a report on the <br /> pilot test and will be the key components of our recommendations for a final Corrective <br /> Action Plan (CAP) for the site <br />' 5.0 SCHEDULE AND REPORTING <br /> Geological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br />' plan approval, USTCFP cost pre-approval and upon issuance of the borehole permits The <br /> information gathered during this phase of work will be presented in a report, which will <br /> include a summary of the pilot test with APT data Dr Ray Kablanow, a registered <br /> professional geologist, will supervise the project Copies of the report will be forwarded to <br /> both the appropriate County and State regulatory agencies (SJCEHD and CRWQCB-CVR) <br /> Groundwater monitoring, involving all of the site's wells, will occur on a quarterly basis A <br /> report will be issued for each monitoring event and submitted to the County and State <br /> agencies <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />