Laserfiche WebLink
r <br /> e <br /> rr <br /> I <br /> grade. The well casing will be cut off 2.5 feet below grade (6 inches above the bottom of <br /> the excavation). The well will then be filled with grout and the grout will be allowed to <br /> spill over the top of the casing and fill the hole o a thickness of 1 foot(6 inches above the <br /> well casing). The hole will then be backfill d with soil and capped with concrete, <br /> asphalt patch,or soil to match the surrounding grade. <br /> Due to residual levels of gasoline constituents in wells MW-1 and MW-6,these wells will <br /> be drilled out to their original depth using 10" augers. The resulting borehole will then <br /> be filled with grout and capped with soil tomatch the surrounding grade. <br /> A copy of the well logs for each of the 9 wells i included in Appendix A. <br /> 2.5 REPORT PREPARATION <br /> After the field activities are completed CRA w LU generate a report documenting the well <br /> destructions and submit it to the EHD. <br /> 2.6 SCHEDULE <br /> We will apply for the well destruction permits and will schedule a C-57 licensed drilling <br /> contractor to perform this work as soon as possible. <br /> 241511(s) 2 CONESTOGA-ROVERS&ASSOCIATES <br />