Laserfiche WebLink
Mac 0 2007 5 : 26PM CARAONTECH 9098643032 P . 5 <br /> A% Fiberglass-Composite Pipe Division <br /> AMERON <br /> IRTHRNATIONAL i J _ALOY® 3000 <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATION OF COMPLETION <br /> Ameron International Fiberglass-Composite Pipe Division <br /> hereby certifies that <br /> Victor Espinoza <br /> TLM Petro Labor Forces Inc. <br /> has completed training on the proper installation procedures for <br /> the Dualoy 3000 UL Listed fiberglass piping systems <br /> indicated below as manufactured by the <br /> Fiberglass-Composite Pipe Division of <br /> f" <br /> Ameron International Corporation. <br /> DUALOY 3 000 <br /> ® /L M /.CX <br /> California <br /> Location of Training <br /> October 31, 2006 <br /> Date of Training <br /> Bill Robbins <br /> Issued By <br /> Certificate valid for three yeah from date of issue <br /> 9720 Cypresswood Drive, Houston, TX 77070 <br /> Fpe"a <br />