Laserfiche WebLink
Dec 06 2007 5 : 27PM CARBONTECH 9098643032 P . 6 <br /> A% <br /> A% Fiberglass-Composite Pipe Division <br /> AMERON <br /> INTEIi1VAT10lVAL DUALLY° 3000 <br /> INSTALLATION PROCEDURES TRAINING <br /> CERTIFICATION OF COMPLETION <br /> Ameron International Fiberglass-Composite Pipe Division <br /> hereby cert des that <br /> Joe Delgado <br /> TLM Petro Labor Force, Inc. <br /> has completed training on the proper installation procedures for <br /> the Dualoy 3000 UL Listed fiberglass piping Systems <br /> indicated below as manufactured by the <br /> Fiberglass-Composite Pipe Division of <br /> Ameron International Corporation. <br /> DUALOY 3 000 <br /> /L ® /LCX <br /> California <br /> Location of Training <br /> October 31, 2006 <br /> .._�....-----...__._.—Date of Training-------------- <br /> Bill Robbins <br /> Issued By <br /> Certi(icate valid for three years from datc of issue: <br /> 9720 Cypresswood Drive, Houston, TX 77070 <br /> FPes90 <br />