My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MELLON
>
800
>
2800 - Aboveground Petroleum Storage Program
>
PR0515468
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2021 8:26:53 AM
Creation date
3/8/2019 8:32:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515468
PE
2832
FACILITY_ID
FA0003691
FACILITY_NAME
MBM, Manteca
STREET_NUMBER
800
STREET_NAME
MELLON
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
800 MELLON AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McLane Company - Manteca, CA <br /> Engineering Certification <br /> 40 CFR 112.3(d)(1)(iv) <br /> I hereby certify that: <br /> 1. I am familiar with the applicable SPCC Plan requirements of 40 CFR 112.7; <br /> 2. Either I or my agent has visited and reviewed this site; <br /> 3. The SPCC Plan is prepared with good engineering practices, best management <br /> practices and applicable industry standards; <br /> 4. The procedures for the SPCC requirements of frequent inspections and periodic testing <br /> is established herein; <br /> 5. This SPCC Plan is adequate for the facility. <br /> �As'1J A�S.EI� <br /> Print name of Regi t red Professional Engineer <br /> QpOFESS/C�� <br /> Si tore of Registered Professional Engineer <br /> m <br /> � No.70508 a <br /> 7r S" Jr * EXP.3INZI <br /> �q CV1� 3 <br /> Registration Number- State of California 2F Corp ICPU <br /> Date of a re <br /> Location of SPCC Plan 40 CFR 112.3(e) <br /> McLane Company maintains their SPCC Plan in the main office building, located at 800 <br /> Mellon Avenue, Manteca, CA 95337. The SPCC Plan is placed in a position to enable the staff <br /> of McLane Company to have easy access to record their monthly inspections, and to assist them <br /> in their spill containment procedures. Office hours and availability of the SPCC Plan are from 8 <br /> AM-4:30 PM,Monday through Friday, excluding major holidays. <br /> J <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.