Laserfiche WebLink
SWRCB, January 2002 Page <br />9. SPILL/OVF,RFILT, CONTAINMENT ROYFfi <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X (See Comments!) <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specie) <br />Test Equipment Used: Equipment Resolution: <br />Spill Box #.,_ w, <br />Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: _ <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br />COmmettts — (include information on repairs made prior to testing, and recommended follow-up for railed tests) <br />Spill Boxes Tested Annually with Monitoring System Certification! <br />