Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page -; of --7 <br />Test Method Developed By: aping Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Specify) <br />Test Method Used: fpressffe 0 V-,cuum El Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: f1,#S5UVe *I <br />Equipment Resolution: VO <br />10. <br />Piping Run #L <br />Piping Run #z <br />Piping Run # 3 <br />Piping Run <br />Piping Material: <br />F1 <br />2. e k <br />Piping Manufacturer: <br />A 41, <br />PP <br />Piping Diameter: <br />3 <br />Length of Piping Run: <br />9,01 <br />0 >,, <br />Product Stored: <br />U&1' ieet,�t a871-(Wek <br />Uw feo4j 97S, -,Ph <br />rW" "'? i V,4V% <br />so I *.k V&P C,K <br />Method and location of <br />piping -run isolation: <br />-7-r-:54- bo v4.v -I- <br />P; P am 1 2 - <br />e, bod4- el+' <br />- 0'' <br />r,, -r <br />Wait time between applying <br />essure <br />9 6essure acuum/water and <br />test: <br />6 I't <br />Test Start Time: <br />B l 0 <br />0 <br />2 <br />Initial Reading (RI): <br />5 )' <br />Test End Time: <br />12. 0 V - <br />Final Reading (RF): <br />5 -1- <br />lis. --r <br />_7-7 <br />Test Duration: <br />k V <br />hovk <br />/ '41 1 I't <br />Change in Reading <br />0,0s -r- <br />-T- <br />-(RF-R,): <br />Pass/Fail Threshold or <br />Criteria: <br />5 i N 5S <br />0 TkI ? 5 T <br />A) 0 to;; PJ -1- <br />/v i H 11157 <br />Test Result: <br />XPass El Fail <br />"ass 0 Fail <br />ass 0 Fail <br />I <br />-,ePass 0 Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />