Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page' of <br />-7- <br />Test Method Developed By: Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br />O'Other (Specify) <br />Test Method Used: Nlpressure 0 Vac--lurn 0 Hydrostatic <br />0 Other (Specify) 9 <br />Test Equipment Used: <br />Equipment Resolution: I S- 105 <br />Piping Run #5 <br />Piping Run 6 <br />Piping Run 4 " <br />iping Run # <br />Piping Material: e" S e) <br />6 k,7 f <br />k -el <br />Piping Manufacturer: <br />r <br />Piping Diameter: <br />Length of Piping Run: i) p Ye)x, <br />p p voy, dApovux, <br />-70 <br />T <br />Product Stored: W 1e4,�J 117 Vd"+ <br />O -7 V&A <br />I <br />Method and location of -r- 54- ba 6q- 4+ <br />piping -run isolation: aeP4 4- acr�K <br />-r-S4- b, <br />1° ex <br />. 6 e,,,, 4- e,+ <br />S4- <br />4- 13 6 V <br />between applying <br />ssur urnJwater and <br />c:7 <br />9 w . <br />starting t' <br />in;gRes'l: / <br />kovi- <br />I �1 a 44 k- <br />Test Start Time: /0 <br />V <br />Initial Reading (Ri): P454,-- <br />12 $:T7 <br />A <br />Test End Time: (j <br />Final Reading (RF): 17 <br />Test Duration: 14 O ✓ <br />%1 e)", <br />Change in Reading (RF -R,): <br />/71; 17 <br />-7-- <br />s7-- <br />Pass/Fail Threshold or <br />Pass/Fail <br />Criteria: Na Los5 jk, QST <br />tj o Cuss &-41 P5 --y- <br />4j 1) Coy w PS -r - <br />Test Result: 'D<Pass 0 Fail I <br />2ass 0 Fail <br />,& <br />,�KPass 0 Fail <br />/0 Pass 0 Fail\ <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />