|
SWRCB, January 2002
<br />6. PIPING SUMP TESTING
<br />Page IS of _7
<br />Test Method Developed By: U Sump Manufacturer U Industry Standard professional Engineer
<br />U Other (Spec)
<br />Test Method Used: U Pressure U Vacuum 'hydrostatic
<br />U Other (Sped) l \
<br />Test Equipment Used: C41�&u e ( f 6o -L ao., i.Q 1�� i ee. 4w
<br />Equipmertt Resolution: O o i S
<br />Sump # _L Sump # Z
<br />Sump # 3 Sump #
<br />Sump Diameter q? 1L/L '
<br />e �Z-1
<br />Sump Depth:
<br />3 i
<br />Z► r
<br />3 3(7,11
<br />Sump Material:
<br />fi v ( #
<br />� e � ✓ x S
<br />1 2p v i S S
<br />4 1-1 ce im
<br />(D ..
<br />Height from Tank Top to Top of
<br />Highest Piping Penetration:
<br />$
<br />Height from Tank Top to Lowest
<br />q
<br />, l
<br />i t
<br />�. (e y Et
<br />rvY
<br />Electrical Penetration:
<br />wi
<br />Condition of sump prior to testing:
<br />pr
<br />r
<br />r
<br />o ✓(1
<br />Portion of Sump Tested'
<br />f/U q 4 e r Lw _. ZO
<br />WetW'" I, 197"Wq-(eY-4w(_
<br />L-711
<br />(,1)o4 -e -r Lw1_ 2. v
<br />Does turbine shut down when
<br />sump sensor detects liquid (both
<br />yes U No U NA
<br />es U No U NA
<br />es U No U NA
<br />U Yes o U NA
<br />product and water)?
<br />Turbine shutdown response time
<br />-7 �tx,
<br />Is system programmed for fail-safe
<br />�
<br />shutdown?
<br />Yes U No U NA
<br />'\
<br />Yes U No U NA
<br />es L! No U NA
<br />es U No U NA
<br />Was fail-safe verified to be
<br />es U No U NA
<br />es U No U NA
<br />Yes U No U NA
<br />es U No U NA
<br />operational?'
<br />Wait time betwying
<br />pressure/vacu wat and starting
<br />test:
<br />rYt '�(,11=1
<br />ZttE ,r'S
<br />f ® "1 e:tcec 1 �!
<br />0/y.4VMJ'e
<br />Test Start Time:
<br />/0 ; / f
<br />/6: fO
<br />1: 3
<br />Initial Reading
<br />Crv5J- G/Lt
<br />Crk--60
<br />Ff,S'-erre-CQ
<br />Test End Time:
<br />/!� : r/5
<br />/r/0
<br />/." U IJ
<br />Z ; a Sr
<br />Final Reading (RF):Fn,-5
<br />� C4,GCE
<br />� ✓, CrvG.4"
<br />Ys CSG
<br />F A-4 64--e-'U_
<br />—
<br />Test Duration:
<br />36 ►'' P""t 4-e S
<br />3o rte► vu was
<br />4 ter r w r l t
<br />30 tw mow' ,,,,WS
<br />Change in Reading (&-RT):
<br />c) (At—'41(7U
<br />rn•
<br />!� w-
<br />p�• r.w'
<br />Pass/Fail Threshold or Criteria:
<br />,. bb 5-(56 ram-
<br />001" 30 r -t
<br />, 0 6 S1,50rt
<br />, ,0 6 ,dr- —
<br />., ......,... »...: .....,,.»... .:.,...,«...,.......... ... .... .......:.....
<br />-,.,.. .,,`#.. ...:ea .:�.. .. t....r.:..
<br />,....,_:.:.........:, :....,.».:.......,...:....
<br />.n.. ...r.,...n.. ...t.
<br />•.....: ...... ......,.......:..,..
<br />..,r.. .n..
<br />ttt .:.:..:,««.:.:.:..x�rr:it:.,.:..:.::.:_...::•.i::::
<br />!
<br />�n:::zttnratsr:::tnnt:: r�:
<br />Was sensor removed for testing?
<br />s U No U NA
<br />U No U NA
<br />es U No U NA
<br />es U No U NA
<br />Was sensor properly replaced and
<br />es U No U NA
<br />Yes U No U NA
<br />Yes U No U NA
<br />' Yes U No U NA
<br />verified functional after testing?
<br />Comments — (include In on repairs made prior to testing mrd recommended follow up for failed tests)
<br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an
<br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160)
<br />
|