Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page IS of _7 <br />Test Method Developed By: U Sump Manufacturer U Industry Standard professional Engineer <br />U Other (Spec) <br />Test Method Used: U Pressure U Vacuum 'hydrostatic <br />U Other (Sped) l \ <br />Test Equipment Used: C41�&u e ( f 6o -L ao., i.Q 1�� i ee. 4w <br />Equipmertt Resolution: O o i S <br />Sump # _L Sump # Z <br />Sump # 3 Sump # <br />Sump Diameter q? 1L/L ' <br />e �Z-1 <br />Sump Depth: <br />3 i <br />Z► r <br />3 3(7,11 <br />Sump Material: <br />fi v ( # <br />� e � ✓ x S <br />1 2p v i S S <br />4 1-1 ce im <br />(D .. <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />$ <br />Height from Tank Top to Lowest <br />q <br />, l <br />i t <br />�. (e y Et <br />rvY <br />Electrical Penetration: <br />wi <br />Condition of sump prior to testing: <br />pr <br />r <br />r <br />o ✓(1 <br />Portion of Sump Tested' <br />f/U q 4 e r Lw _. ZO <br />WetW'" I, 197"Wq-(eY-4w(_ <br />L-711 <br />(,1)o4 -e -r Lw1_ 2. v <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />yes U No U NA <br />es U No U NA <br />es U No U NA <br />U Yes o U NA <br />product and water)? <br />Turbine shutdown response time <br />-7 �tx, <br />Is system programmed for fail-safe <br />� <br />shutdown? <br />Yes U No U NA <br />'\ <br />Yes U No U NA <br />es L! No U NA <br />es U No U NA <br />Was fail-safe verified to be <br />es U No U NA <br />es U No U NA <br />Yes U No U NA <br />es U No U NA <br />operational?' <br />Wait time betwying <br />pressure/vacu wat and starting <br />test: <br />rYt '�(,11=1 <br />ZttE ,r'S <br />f ® "1 e:tcec 1 �! <br />0/y.4VMJ'e <br />Test Start Time: <br />/0 ; / f <br />/6: fO <br />1: 3 <br />Initial Reading <br />Crv5J- G/Lt <br />Crk--60 <br />Ff,S'-erre-CQ <br />Test End Time: <br />/!� : r/5 <br />/r/0 <br />/." U IJ <br />Z ; a Sr <br />Final Reading (RF):Fn,-5 <br />� C4,GCE <br />� ✓, CrvG.4" <br />Ys CSG <br />F A-4 64--e-'U_ <br />— <br />Test Duration: <br />36 ►'' P""t 4-e S <br />3o rte► vu was <br />4 ter r w r l t <br />30 tw mow' ,,,,WS <br />Change in Reading (&-RT): <br />c) (At—'41(7U <br />rn• <br />!� w- <br />p�• r.w' <br />Pass/Fail Threshold or Criteria: <br />,. bb 5-(56 ram- <br />001" 30 r -t <br />, 0 6 S1,50rt <br />, ,0 6 ,dr- — <br />., ......,... »...: .....,,.»... .:.,...,«...,.......... ... .... .......:..... <br />-,.,.. .,,`#.. ...:ea .:�.. .. t....r.:.. <br />,....,_:.:.........:, :....,.».:.......,...:.... <br />.n.. ...r.,...n.. ...t. <br />•.....: ...... ......,.......:..,.. <br />..,r.. .n.. <br />ttt .:.:..:,««.:.:.:..x�rr:it:.,.:..:.::.:_...::•.i:::: <br />! <br />�n:::zttnratsr:::tnnt:: r�: <br />Was sensor removed for testing? <br />s U No U NA <br />U No U NA <br />es U No U NA <br />es U No U NA <br />Was sensor properly replaced and <br />es U No U NA <br />Yes U No U NA <br />Yes U No U NA <br />' Yes U No U NA <br />verified functional after testing? <br />Comments — (include In on repairs made prior to testing mrd recommended follow up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />