Laserfiche WebLink
7) A 3-comp sink -bar sink- with drain boards, and a hand sink must be installed in the <br /> bar area. <br /> You must keep this office informed of the construction progress. An inspection must be <br /> scheduled at least 48 hours in advance when the facility is ready to open with all <br /> equipment installed and thorough cleaning completed. A fee of$95.00 per hour may be <br /> accessed for any additional inspections, re-inspections or consultations. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in <br /> compliance with applicable County Codes and/or State Laws, shall be constructed or <br /> reconstructed upon request of the Environmental Health Department. Inferior <br /> workmanship, equipment, or materials will not be accepted for the construction or <br /> operation of a food facility. Any variance from the requirements outlined in this letter <br /> will require written approval from this Department. <br /> Approval of the submitted plans shall become null and void if the work authorized is not <br /> commenced within 180 days from the date of approval, or the work authorized by such <br /> plans is abandoned. In order to renew action on an expired plan approval, the applicant <br /> shall submit fees equal to that of a new plan review. A copy of approved plans shall be <br /> available on site at the time of final inspection. <br /> If you have any questions related to this plan check approval letter, please contact Vidal <br /> Pedraza, Senior R.E.H.S., at(209) 468-0334. <br /> Donna Heran, R.E.H.S., Director <br /> Environmental Health Division <br /> Jeff C"co R.E.H.S. <br /> Program Coordinator <br />