Laserfiche WebLink
EXPLORATION - JOB HAZARD ANALYSIS (JHA) <br /> r <br /> Project Name: Tracy Ridge Warehouses Initiation Date: <br /> Project Number: NA 185148 Completion Date: <br /> Client: Patrick Hastie, Construction Manager Weather: <br /> Potential Hazards Recommended Action <br /> Mobilization Use proper defensive driving techniques <br /> Traffic Control Use cones and flagging as necessary <br /> Heat/Cold Stress Stay Hydrated -Take Breaks <br /> Slips, Trips, and Falls eep work area clean and be aware of physical surrounding <br /> Overhead Obstructions Be aware of overhead powerlines, roofs, etc. <br /> Underground Utilities Be sure all utilities are marked <br /> Pinch Points around Machinery Be aware of location of pinch ponts <br /> Heavy and/or Repetitve Lifting Use proper lifting techniques (use of legs not back) <br /> Natural Elements Be aware of insects and animals and dress for conditions <br /> Project Specific Hazards (IN PTP MEETING) Recommended Action <br /> On-Site Hazards Identified IN FIELD Action Taken <br /> Pre-Job Preparation <br /> PPE Requirements: Hard Hat ❑Q Safety Glasses ❑Q Safety Vest ❑Q Steel Toed Boots ❑ FRC <br /> ❑ Face Shield <br /> Training Requirements: <br /> LEM Signature: <br />