Laserfiche WebLink
TAILGATE SAFETY MEETING / PRE-TASK PLANNING MEETING <br /> Project: Tracy Ridge Warehouses Location: 6599 W. Grant Line Road Tracy, California <br /> Date: Work Care: (888)449-7787 <br /> Has Exploration Package Been Provided Prior to Mobilization: ❑ Yes ❑ No <br /> Has Exploration Team STRETCHED prior to Work: ❑ Yes ❑ No <br /> Onsite Personnel: <br /> Current Conditions <br /> Weather Conditions: Road Conditions: <br /> Temperature: <br /> ❑ Dry ❑ Wet ❑ Muddy <br /> ❑ Sunny ❑ Windy ❑ Overcast ❑ Snow ❑ Icy ❑ Gravel <br /> ❑ Rain ❑ Snow ❑ Ice <br /> Personal Protective Equipment <br /> ❑ Hard Hats(MSD Approved) ❑ Hearing Protection ❑ Other/Miscellaneous <br /> ❑ Safety Glasses with Side Shields ❑ Gloves <br /> ❑ Steel Toe Work Boots ❑ Insect Repellant <br /> ❑ High Visibility Apparel(Class ll) ❑ Life Jacket <br /> ❑ First Aid Kit ❑ Snake Chaps/Boots <br /> Site Specific Conditions <br /> ❑ Overhead Power Lines ❑ Wildlife ❑ Traffic/Roadway Hazards <br /> ❑ Ditches/Hills/Slopes ❑ Barbed Wire ❑ Other/Miscellaneous <br /> ❑ Canal/River/Wetlands ❑ Difficult Owner <br /> ❑ Difficult Access Road ❑ Aggressive Animals <br /> ❑ Potential Environmental Issues ❑ Lack of Cell Phone Service <br /> Terracon Life Saving Absolutes <br /> Proceed with exploration operations only when in posession of a valid public utility clearance number or ticket on which Terracon is <br /> identified as the excavator.Use Stop Work authority in the event of unclear utility markings. <br /> Prior to mobilization,verify approved*traffic control measures are in place before beginning work within,or immediately adjacent <br /> to,active roadways. <br /> Maintain a safe working distance from overhead powerlines in accordance with overhead utility minimum safe clearance distances <br /> Operate drill rig controls only when authorized. <br /> Maintain a minimum of two authorized crew members at the drill rig while it is operational. <br /> Keep clear of rotating equipment only making contact when rotation has come to a complete stop. <br /> Only use leveling jacks to stabilize the drill rig.Do not use leveling jacks to remove tooling. <br /> Place tower and feed cylinders in travel position before moving or repositioning the drill rig. <br />