Laserfiche WebLink
INDIVID , TANK INFORMATION ANAST RESULTS <br /> P Ta <br /> TEST DATE:07/29/99 8900 SHOAL CREEK, BUILDING'2W WORK ORDER NUMBER2209536 <br /> CLIENT:ARCO PRODUCTS COMPANY AUSTIN,TEXAS 78757(512)451-6334 SITE:ARCO <br /> Tank ID: 10K # 2 Tank manifolded: No Bottom to top fill in inches: 180.0 <br /> Product: REG UNLEAD Vent manifolded: No Bottom to grade in inches: 186.0 <br /> Capacity in gallons: 10,180 Vapor recovery manifolded: YES Fill pipe length in inches: 62.0 <br /> Diameter in inches: 118.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 217 Overspill protection: YES Stage I vapor recovery: DUAM <br /> Material: DW FIBERG Installed: Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> Start(in) End(in) <br /> Dipped Water Levet: 0.00 0.00 New/passed Failed/replaced New/passed Failed/replaced <br /> L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Dipped Product Level: 36.00 36.00 <br /> Probe Water Level: 0.000 0.000 Make: <br /> Ingress Detected: Water N Bubble N Ullage N Model: <br /> Test time: 14:12-16:03 S/N: <br /> Open time in sec: <br /> Inclinometer reading: 0.00 Holding psi: <br /> VacuTect Test Type: Multiple tanks Resiliency cc: NOT NOT <br /> VacuTect Probe Entry Point: Fill est leak rate ml/m: TESTED TESTED <br /> Pressure Set Point: -0.50 IT Metering psi: <br /> Tank water level in inches: 0.00 Calib. leak in gph: <br /> Water table depth in inches: Results: <br /> Determined by (method): <br /> Result: PASS COMMENTS <br /> COMMENTS <br /> .::.... ::::::......:::::::::::::::::::::: ::::::.: : ::.:::::::::::.::::::::::.::::::::::. <br /> xxx <br /> . .: +�►�. :.:;;;:.;:;;.;:.;:.;.;:.;:::.:::.;:::,::..:.:..:.............sss;.........:.::::................ .::..:::::.::::..:::::::::::::::::::..::.::..:................... .................... ...................... <br /> Material: DW FIBERG <br /> Diameter(in): 2.0 <br /> Length (ft): 100.0 <br /> Test psi: <br /> Bleedback cc: <br /> Test time(min): NOT NOT NOT NOT <br /> Start time: TESTED TESTED TESTED TESTED <br /> End time: <br /> Final gph: <br /> Result: <br /> Pump type: PRESSURE <br /> Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: UNKNOWN <br /> Draft 07/30/1999 09:27 MSHAW <br />