My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 2:09:22 PM
Creation date
3/26/2019 10:53:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. No fuel deliveries can be made to any tank on site while technician is inside a tank. <br /> 6. When tank entry is required by the Technician, a person trained in CPR must be beside <br /> the entry hole at all times when the Technician is inside the tank. This person is in addition <br /> to the safety person, If one is not available from► the contracting crew, an off duty fireman, <br /> nurse, EMT, or equivalent is acceptable. Besides administering CPR, the person will assist <br /> the safety person should an emergency rescue be required. <br /> 7. Our Technician will perform an air/soap tigh•_ness test confirming his repairs to the <br /> exterior of tank, and possibly identify any other potential problems on the exposed areas of <br /> the tank. All efforts must be made to isolate, disconnect, or plug all the piping on tank, If <br /> this test is done, and at a later date another pro')lem with the tank is identified, it will be the <br /> financial responsibility of the owner or contractor to schedule a return trip to the site. <br /> 8. It is important that the contractor or owner contact the appropriate local and state <br /> authorities for regulations concerning the jobsite. lobsite permits may need to be obtained <br /> for the excavation or remanufaeture of the tank. Regulations governing testing of <br /> underground tanks should be determined so Te:hnician can be advised. <br /> 9. The contractor must disconnect the electrical supply and remove the pump from the <br /> tank. The product line at the pump must also be disconnected or capped. This will insure <br /> no fuel can enter the tank while Technician is working. <br /> 10. The water table in the tank hole must be controlled at all times. The Technician is <br /> unable to remanufactur interior or exterior surfaces if they are wet. Controlling the water <br /> table will also prevent the tank from floating. <br /> 11. Tanks to be entered, must be triple rinsed and defamed prior to technician's arrival. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.