Laserfiche WebLink
4• PIPING TESTING: TESTING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED, THE SEALING <br /> 11 UG, CONDUIT: ALL U,G, CONDUIT TO TANKS SHAM_ BE RIGID STEEL PVC COATED SCHEDULE Sheet NotesBOOT IN THE SUMP IS TO BE INSTALLED WITH THE. VALVE TURNED DOWN. AFTER � a � ; _ W „ � EDUL.E 40m <br /> Sa PREFABRICATED ASSEMBLIES: A CERTIFICATE OF APPROVAL SHALL. BE FURNISHED WITH EACH PVC CONDUIT MAY BE SUBSTITUTED FOR RIGID GALVANIZED EXCEPT FINAL. 10'--0- FUSTICK) <br /> TESTING THE VALVE IS TO LSE OPENED TO ALLOW DRAINAGE OF THE SECONDARY " (FULL <br /> PREFABRICATION ASSEMBLY, CERTIFYING THAT THE ASSEMBLY t�k� STRUCTURE IN QUESTION HAS T(� .ANY LOCATION. PVC CONDUIT MINIMUM BURY DEPTH IS .4 PER CODE, <br /> 1. -- SUMP WIPING PENETRATIONS; PIPING TO THE SUMP MONITOR PROBE. BEEN INSPECTED MEETIN THE REQUIREMENT H <br /> > , G EOF E CODE. 14a <br /> SUMP PIPING PENETRATIONS SHALL_ E E MADE USING BULK HEAD FITTINGS S. -- PIPING PENETRATIONS: A PENETRATIONS. T � S N I � � RISER GROUNDING: RISER GROUNDING; ALL RISERS IN THE FILL SUMP AND TP1F ANNULAR <br /> G �, S ALLOF THE SUMP TO BE ON A LINE TOWARD THE CENTER <br /> ELECTRICAL PENETRATIONS SHALL B MADE � — a � SPACE RISER SHALL, BE GROUNDED AND BONDED PER 7AI <br /> ,�� ('ENVIRON-), � � � . O�-THE SUMP TO ENSURE THE PROPER INSTALLATION OF :ALL BULKHEAD AND COMPRESSION FITTINGS 9x TANK STABILITY: TANK STABILITY' SMALL BE CHECKED AGAINST FLOATATION. DF L � ON DWG. TK4 �. <br /> 6 WITH APPROPRIATE WATER TIGHT COMPRESSION FITTINGS WITH SEAL--OFFS. � � <br /> AND RESULTANT TIGHTNESS, ALL PIPING, CCJNDtr1ET AND GROUNDS THAT PENETRATE 1 „ .._ SPACE . p -. <br /> � m a ANNULAR ,.f'ACE LOCATION. FOR A 12p00t�/"1 Om0O0 GALLON 10 DIAMETER SPLIT TANK THE <br /> (LE, ENVIRON). THE SUMP SIDE `WALL MUST BE SEALED IN SUM�S. SUMPS SHALL BE HYDROSTATICALLY 10, --� NOT N USED. ANNULAR SPACE RISER IS LOCATED ON THE TURBINE SIDE OF THE 12m000 GALLON COMPARTMENT <br /> Ld2. — SIPHON PIPING; TESTED WITH STANDING WATER FOR A PERIOD OF; 24 HOURS TO INSURE THAT THE SUMPS AS SHOWN. <br /> ARE WATERTIGHT. THE ARCO EIEhL� ENGINEER MUST: SIGN OFF ON THIS TESTING ON T6-I TANK 11. <br /> . <br /> THE HEIGHT OF PENETRATIONS INTO SUMP FOR SIPHON PIPING VARY BETWEEN TANKS. METHANOL, COMPATIBILITY, FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS ALL READILY <br /> f E H E ,� q <br /> .. .a ro q .. - ,: .. m a .. !�. _» P m r of <br /> INSTALLATION CHECK LIST BEFORE CONTRACTOR WILL. RE PAID. TO OF TANK ELEVATION._ TO CALCULATE TOFF OF TANK ELEVATION, START WITH <br /> SEE DETAILS 7 B ON DWG, TK3 FOR TANK SIPHON PIPING DETAILS. C L ACCESSIBLE COMPONENTS WHICH ARE NOT METHANOL COMPATIBLE FOR THE IMMEDIATE _ TH 1F3 MINIMUM <br /> W <br /> DEPTH OF VAPOR ,RECOVERY LINE AT THE FARTHEST DISPENSER AN � " ; <br /> ;, -�� FILL" AND VAPOR GAP HEIGHT T GRADE: THIS DIMENSION S CRITICAL,A AN M ADHERED T INTENDED FRVI F-I D SLOPE 1 4 PER FOOT <br /> e G O E S SIO. . IS C E C` L D UST BE O. SERVICE SHALL BE RETROFITTED INTO THE STORAGE SYSTEM. � W, _ <br /> m m SHALL UNDERWRITERS LABORATORY APPROVED AS CALLED FOR ON THE MAXIMUM TO 1 1S PER FOOT OT MINIMUM A to " <br /> ��. � 3e -, TANK(S�. .�H LL BE. CONTRACTOR WILL BE REQUIRED TO REINSTALL AT �OWN EXPENSE OR WILL BE BACK CHARGED FOR (f/ FO MINIMUM, DD 12 AT THE TANK, ADD 1 a� `/JJF°g'OR � PIPE <br /> m 1 N a c a a " <br /> SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND n OR FOR 2 FOR A CHANGE IN PIPING' DIRECTION OTHER I <br /> a EXPENSE TCS CORRECTONCONSISTENCIES, 1a -- MANHOLE CROWNS: A MANHOLE OPENINGS ( � ( R Tf-AN �Q OR 4�a a SETT TANKS 0 <br /> � � ., ECO Sa LL E OLE O E NGS ON THE TANK SLAB SHALL BE INSTALLED �M11TH , - <br /> �� SHALL. BE, DOUR ,E WALL TANKS OF FIBERGLASS REINFORCED PLASTIC FRP AS _ � DEEPER THAN CALCULATED AS PRECAUTION', IN N <br /> L" (FRP) A l 1 CROWN FCONCRETE T PRCV T IO EVENT SHALL.. THE TANK BE BURIED LESS <br /> .�,� /'2 O O PREVENT WATER INTRUSION INTO THE MANHOLE. a � . <br /> c _ ? r <br /> 7e TURBINE I M P T - <br /> XCORPORATION, � IN TA TI NOF TANKS AND PIPING U B NE; SUM. SENSOR: SEE SHEET K4 �_ DETAIL 1 FOR LIQUID SENSOR DETAILS, PROBE TO THAN 4 0 BE FINISHED C.� MANUFACTURED BY XER ES INSTALLATION O E W L Q SECTION N C" K a.... _LOW F l�a ED GF�ADE" OR DEEPER THAN 7 0 BELOW FINISHED GRADE. SEE <br /> . SEE. �ECT ON A O DWG, T �. THE AF�CC) FIELD ENGINEER WILL BE REQUIRED TO SIGN <br /> SPECIFICATION Wf <br /> I BE MOUNTED AT SIDE OF TANK WHERE PRODUCT PENETRATION RATION INTO SUMP IS MAD E A D LOW <br /> �`� .SHAD. BE IN ACCORDANCE WITH ,�f E,CIFICATIC)N 13800 LATEST EDITION AS PROVIDED E D E ET U D N BE OFF N THIS IT M ON TI-I ANK IN T T � MANUFAC;TURERS INSTALE_ATION RECOMMENDATIONSa -ANY VARIATIONS !N SLOPE' FROM 1 4 <br /> � ro ,, m � -- � O E E T SALLA ION CHECKh.IST BEFORE CONTRACTOR WILL BE PAID. � <br /> C�1 BY ARCO PETROLEUM PRODUCTS COMPANY, AND MANUFACTURERS INSTRUCTIONS. LOWEST PENETRATION FITTING WITHIN SUMP AREA. PER FOOT SHALL BE REPORTED TO THE FIELD ENGINEER, <br /> "TAII J C 0 <br /> LjJ 47000 <br /> I <br /> LI LEVEL, USF ACTT E SIPHON _., ._,_.. <br /> -� B - I INSTALLED) 20, <br /> _ _ P >� GAL. R' OCTANE <br /> T� 1 I B <br /> 3 <br /> PRODUCT 21 S TA FUEL G E F3 DETAIL A OS ON <br /> G TK3 2 4 <br /> Z ' _ Q cwt (IF N TALLER) <br /> CIT� <br /> U, <br /> L .a.,,d 1 I WW t0 "° �A,# '"Y 4b„ " „ WP Afi P - ..,_� <br /> C. ,. MP? MO I RING � 1 2 1 2 SUM YOKING Ld <br /> 1 I ! UID P c g va PIPE P E LIQUID R E4-0 <br /> K2-11A <br /> I C+ E NOT , I GAUGE _ SEE NOTE 1 <br /> f« ..� 2 x VE N _ " WR ) " LL 2 F» a - ENT �. ,,� G <br /> 1 EE NOT B SS PO _ 1 <br /> O. �. ., 4 AND . <br /> K LEVE UCE 2 a <br /> C 10 Wa I INSTALL D 1 C 2 I 0 <br /> W I N a , <br /> S BLA EEL a <br /> D LA TEFL` 1 4 I L ADA E «« <br /> I I <br /> A D CAP IN LL "0 0 <br /> A.:,M C N AINMEN L BOX <br /> Nz- <br /> -0 <br /> �0 <br /> _ _ _ _ <br /> 0 0 <br /> AT <br /> _e -- <br /> L <br /> �)' 0_ SA - L MANHOI CCESS 0 ERS <br /> " T ELOW E SHALLE <br /> C C, ID TIGHTD LOCK B E <br /> `� 11 11 <br /> ks a1 <br /> N 2 UNIO WW <br /> h - ► LxR 2Ba VxRa FOM .- R ,� <br /> 0 � - p 2 _ � SC D BLACK ,I_ VR. FOM _ __ 2 U I <br /> _ HEADE H E A <br /> _ , _ _.__ __. _,.__ _._ a E L)E S LAC EEL <br /> 1K -�1B _ T <br /> 2 ON IN E IT 'AND L SID _• <br /> BULKFI IF GE NOTTf(? 1 E3 , <br /> 22 <br /> BULK <br /> D B T N MAN F. F D 22 <br /> FITTING � �VUVI` <br /> L 10 IR L FD) FITTINALARa DETAIL 1 2 0 <br /> 2 OND TIC 1 CUf�R 1 STANAINACTI IPI dON <br /> TK3 1 TANK L ,AUG SLOPE A SHOWN ON :2 0 <br /> IF INS LLED <br /> ( � ,,. �"� DETAIL ' ON DWG, TK3-2 <br /> INAC SIfPMO , <br /> 4 X VAPOR VERY A FR <br /> SLOP S `SHO N 1 f <br /> cd <br /> [)ETA 10 ON , TK3 IN SPIL ONTAINM <br /> SEE E ALFIITL B X. <br /> _ <br /> cd <br /> CL <br /> 4-1 LD. Plan View <br /> 0 (TYPm SINGLE FILL) 14 15 16 <br /> G <br /> --SEE NOTE 6 <br /> NOT TO SCALE, ii tW " <br /> SEE NTE 4 1 2 TO 4 PVC THREADED cd <br /> T I, 14" 1 S 1 W� , _ � ,� I m <br /> RGd <br /> (SEE NOTE ) 12 m 4 4 1, 2 TO Wp 32 I"De a 4 , ( PIPE CAP <br /> STAT _ 1 1 S <br /> 2 1 CABLE GRIP - 32 I.Dx hTC �� _ PPI . 1 S ALL ,OPENIN S <br /> ( / MIN: TY a TYP. InI�: _ 012 - <br /> S TYR. SEE NOTE 1 EALS SUPPLIED 2WW Y - A.C. PAVING <br /> _ � 1,� MAX'. <br /> W SENSOR <br /> .: = <br /> at <br /> , 04 <br /> , <br /> m _ <br /> « <br /> , <br /> , <br /> y .:. <br /> m <br /> W '^ <br /> ,aaa, ,. <br /> P � � a R <br /> R41 <br /> AC'RA <br /> r <br /> 3 F VEL .m t� P _ , <br /> aa e P GR V MI a <br /> , �° P A EL,_ Nw <br /> as m -�,. 3 EAGRA�FL EA . <br /> ILLVA O, wp <br /> n ^ � <br /> a R <br /> a , <br /> ,A ^ a P . <br /> A F MI � P <br /> SEAL O P <br /> {{''++.RAV _ ..MIN.. <br /> a P m a m <br /> F IT <br /> m H <br /> b <br /> . F <br /> k ' w <br /> M a M oo¢Byy <br /> 1 mP' rtw q <br /> app Pa <br /> P b . <br /> a m-..,• m . tea—�--ry '",': <br /> IN +n <br /> ,. _m__ (� Pry 3 4 O N IT <br /> 4 T .d <br /> } C DU <br /> V N <br /> C' N " <br /> 3 C DU <br /> 2 <br /> 1 <br /> TY <br /> P <br /> N TE ! <br /> EaEpp+ O <br /> ,.. ypy 0..a �.... <br /> 11 <br /> :, pin+ <br /> W 0. NOTE�, �prw 13) ,' <br /> P SE NOTE 1e <br /> E OP TO SU F O 3 <br /> G1� <br /> 4 <br /> !� G a� tee. <br /> 1 TY <br /> f <br /> J BOX , <br /> _ _ POINT <br /> S Wa <br /> LOW OI T <br /> 1 SEE z' NOTE 3 <br /> (SEE NO T" <br /> 2 <br /> X _„ <br /> a I P10 <br /> 3 F'VG PIPE EO EN �2) P IPS H N P I csa Pl O GNA TYWT SE L OFFE P , P C PIP P3 E OE <br /> R <br /> ( <br /> co <br /> TOT BINE <br /> U <br /> T , TT. <br /> A BOTTOM ,M <br /> T <br /> ELF� NOF 2 NOTEE ES G rccaEM MP RI S MP I7, Z <br /> U ONTO N I <br /> Me)j <br /> � U .MC4 C K ST FG S ,_B A S E�LL ,� 4 ~ P r 12I LIPRasC I PR B 1 F3 Q BEIQU O SFE NE i 4 <br /> RISER PRIMED AND ) <br /> D <br /> a. <br /> 3 <br /> E NOTE: <br /> S <br /> t� <br /> E N T ' 7 Wi EE NOTE 7 <br /> 1 a O E , <br /> 0 M SE <br /> } <br /> RAPPED TO CERA I I <br /> T 4 <br /> NOTE 14 <br /> 4 <br /> 2 VENT <br /> S <br /> (SEE O E <br /> x <br /> 1 <br /> V.R PIPING, �- <br /> 4 L � <br /> �4TEE <br /> L <br /> T <br /> BLACK STEEL ,�-", <br /> B� <br /> A <br /> _ T L 1�`P m a <br /> YP <br /> A D qq«« <br /> 2 BELL X <br /> RI P IP AFS <br /> RIS f P„ <br /> T <br /> SE W P E C 2 BEI...L X MALE <br /> MA AP TYP. <br /> L ADAPTER E E <br /> 3 ADAPTER <br /> 9W <br /> 3 ,// <br /> E N TE 13 <br /> 14 <br /> `, p <br /> 12 MAX, <br /> 177! 12 MA�Ca <br /> �Wr BACK FIIMIm, p a a <br /> INDICATES ANCHOR-- � <br /> PEA GRAVEL <br /> STRAP LOCATIONS CRUSHED ROCK ® a W <br /> ✓ (WHEN REQUIRED) 4 <br /> I I AS PER TANK <br /> I I I a <br /> I I MANE<. P a i <br /> I I ECS. (�TYPa� Pw�. . ^.� <br /> I I II II �, <br /> I EXTRACTOR FITTING <br /> I I Fa \� <br /> SEE NOTE:' .� . °'" BALI., FLOAT VALVE <br /> IL I ! II 1 <br /> 8 <br /> EXTRACTOR FITTING 6ifS I I I <br /> I � 1 <br /> �� � E:�AL_Ew. FLOAT VALVE�� � I_— <br /> 1 4a a 9 1 1 1 � 1 �. mm <br /> I 1 1 �� 1 <br /> I� I I I I � � � q <br /> d� <br /> .. "_ <br /> t t____ <br /> R II iI I IIcd T-- 0 <br /> �� N 0 C) cd <br /> BLACK STEL_- I I I 0 <br /> SIPHON. PIPE III I I I I I <br /> L. `r <br /> ANNULAR SPACE I <br /> TANK LEAK <br /> 1�,,ETECTOR <br /> IQUIDOBE I <br /> 1 <br /> SEE NOTE 7 <br /> � 12"x12"x1/4" STEEL / �s <br /> 00 R I STRIKER PL,.ATE-TYPn ALL Ei 4S <br /> OPENINGS ON ' <br /> FIBERGLASS TANK <br /> ^• a Ra R ,a <br /> {(p �^/ <br /> l w <br /> �"" " <br /> ® a R <br /> ^Ch R b < as <br /> 16215 72ND AVENUE SOUTH <br /> -ms 'R a a aaa q„. aWa. epw awAa i <br /> n, - .. rt _ <br /> a i <br /> Pa R as P Rgrt • F �^^ R PEA GRAVEL/0 <br /> TA K SHALL V a ,a• S a p R.a >m° Q a " w SENT WASHINGTON) 251960 2 <br /> 0 TRAPPER SCREEN TYPw SEE NOTE 0 N S _L BE SFT DEAD LEVEL SFE NOTE G <br /> �" aa�aa , R a R a,�an Rim a�aa a awR �Prt b F ( � �, ^p^� P*�a a.�am"i� exam"a "rte. a�'a:° . CRUSHED <br /> aaka m^ Penm mmP ea aP"@ ^ aw^ a <br /> OR SLOPE 1 MAX. O ANNULAR SPACE PROBE- ��� ) z1,_�222 <br /> __�.. .��.« p R a a ,�• : " mm� ^a^�4 a �" ROOK BED <br /> ^ W.� ^a e.� aa�,e^gym � ^� a ,"� <br /> m ^ a a <br /> in, <br /> c ; 2°--0>' MINe TANK SIZE VARIES WITH MANUFACTURER AND MODEL NUMBER END OF TANK <br /> r <br /> ahmm date <br /> C-L Nj,S, <br /> EXCAVATION <br /> °— 'W MIN. N.T <br /> ONLY �XC. VATION �NL"( 10/1/97 <br /> THIS DESIGN`ARRANGEMENT I TYPICAL FOR DOUBLE WALL. FIBERGLASS <br /> TANKS. SEF SITE PIPING PLAN AND MATERIALS LIST ON DRAWING DFA 4 CYT xa <br /> drawn b� <br /> _� ._._, __..m__n.�__.�._._,-�,.,�.__�r.m.,e._,_�-,�-_.-- ��_ �_�_.._______....____�� .�,,....._.._..n_ ._.�..,_� p <br /> TK4-3 FOR ACTUAL MANUFACTURER CHOSEN' FOR THIS PROJECT C)•T/27/k99 Ca) o <br /> PEFW 7-1—r-1 <br /> f <br /> z END 2186 <br /> (r Underground Tank Section <br /> Ld <br /> T <br /> c " N T SCALE: SEE: NOTE` #3 <br /> F:\SR: P \1 \MECHAN \1ANKS\2022\2022'-„21B 10/10/97 1.52 Pm DLS <br /> AR4,/ 2321A"DWG <br />