4• PIPING TESTING: TESTING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED, THE SEALING
<br /> 11 UG, CONDUIT: ALL U,G, CONDUIT TO TANKS SHAM_ BE RIGID STEEL PVC COATED SCHEDULE Sheet NotesBOOT IN THE SUMP IS TO BE INSTALLED WITH THE. VALVE TURNED DOWN. AFTER � a � ; _ W „ � EDUL.E 40m
<br /> Sa PREFABRICATED ASSEMBLIES: A CERTIFICATE OF APPROVAL SHALL. BE FURNISHED WITH EACH PVC CONDUIT MAY BE SUBSTITUTED FOR RIGID GALVANIZED EXCEPT FINAL. 10'--0- FUSTICK)
<br /> TESTING THE VALVE IS TO LSE OPENED TO ALLOW DRAINAGE OF THE SECONDARY " (FULL
<br /> PREFABRICATION ASSEMBLY, CERTIFYING THAT THE ASSEMBLY t�k� STRUCTURE IN QUESTION HAS T(� .ANY LOCATION. PVC CONDUIT MINIMUM BURY DEPTH IS .4 PER CODE,
<br /> 1. -- SUMP WIPING PENETRATIONS; PIPING TO THE SUMP MONITOR PROBE. BEEN INSPECTED MEETIN THE REQUIREMENT H
<br /> > , G EOF E CODE. 14a
<br /> SUMP PIPING PENETRATIONS SHALL_ E E MADE USING BULK HEAD FITTINGS S. -- PIPING PENETRATIONS: A PENETRATIONS. T � S N I � � RISER GROUNDING: RISER GROUNDING; ALL RISERS IN THE FILL SUMP AND TP1F ANNULAR
<br /> G �, S ALLOF THE SUMP TO BE ON A LINE TOWARD THE CENTER
<br /> ELECTRICAL PENETRATIONS SHALL B MADE � — a � SPACE RISER SHALL, BE GROUNDED AND BONDED PER 7AI
<br /> ,�� ('ENVIRON-), � � � . O�-THE SUMP TO ENSURE THE PROPER INSTALLATION OF :ALL BULKHEAD AND COMPRESSION FITTINGS 9x TANK STABILITY: TANK STABILITY' SMALL BE CHECKED AGAINST FLOATATION. DF L � ON DWG. TK4 �.
<br /> 6 WITH APPROPRIATE WATER TIGHT COMPRESSION FITTINGS WITH SEAL--OFFS. � �
<br /> AND RESULTANT TIGHTNESS, ALL PIPING, CCJNDtr1ET AND GROUNDS THAT PENETRATE 1 „ .._ SPACE . p -.
<br /> � m a ANNULAR ,.f'ACE LOCATION. FOR A 12p00t�/"1 Om0O0 GALLON 10 DIAMETER SPLIT TANK THE
<br /> (LE, ENVIRON). THE SUMP SIDE `WALL MUST BE SEALED IN SUM�S. SUMPS SHALL BE HYDROSTATICALLY 10, --� NOT N USED. ANNULAR SPACE RISER IS LOCATED ON THE TURBINE SIDE OF THE 12m000 GALLON COMPARTMENT
<br /> Ld2. — SIPHON PIPING; TESTED WITH STANDING WATER FOR A PERIOD OF; 24 HOURS TO INSURE THAT THE SUMPS AS SHOWN.
<br /> ARE WATERTIGHT. THE ARCO EIEhL� ENGINEER MUST: SIGN OFF ON THIS TESTING ON T6-I TANK 11.
<br /> .
<br /> THE HEIGHT OF PENETRATIONS INTO SUMP FOR SIPHON PIPING VARY BETWEEN TANKS. METHANOL, COMPATIBILITY, FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS ALL READILY
<br /> f E H E ,� q
<br /> .. .a ro q .. - ,: .. m a .. !�. _» P m r of
<br /> INSTALLATION CHECK LIST BEFORE CONTRACTOR WILL. RE PAID. TO OF TANK ELEVATION._ TO CALCULATE TOFF OF TANK ELEVATION, START WITH
<br /> SEE DETAILS 7 B ON DWG, TK3 FOR TANK SIPHON PIPING DETAILS. C L ACCESSIBLE COMPONENTS WHICH ARE NOT METHANOL COMPATIBLE FOR THE IMMEDIATE _ TH 1F3 MINIMUM
<br /> W
<br /> DEPTH OF VAPOR ,RECOVERY LINE AT THE FARTHEST DISPENSER AN � " ;
<br /> ;, -�� FILL" AND VAPOR GAP HEIGHT T GRADE: THIS DIMENSION S CRITICAL,A AN M ADHERED T INTENDED FRVI F-I D SLOPE 1 4 PER FOOT
<br /> e G O E S SIO. . IS C E C` L D UST BE O. SERVICE SHALL BE RETROFITTED INTO THE STORAGE SYSTEM. � W, _
<br /> m m SHALL UNDERWRITERS LABORATORY APPROVED AS CALLED FOR ON THE MAXIMUM TO 1 1S PER FOOT OT MINIMUM A to "
<br /> ��. � 3e -, TANK(S�. .�H LL BE. CONTRACTOR WILL BE REQUIRED TO REINSTALL AT �OWN EXPENSE OR WILL BE BACK CHARGED FOR (f/ FO MINIMUM, DD 12 AT THE TANK, ADD 1 a� `/JJF°g'OR � PIPE
<br /> m 1 N a c a a "
<br /> SITE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND n OR FOR 2 FOR A CHANGE IN PIPING' DIRECTION OTHER I
<br /> a EXPENSE TCS CORRECTONCONSISTENCIES, 1a -- MANHOLE CROWNS: A MANHOLE OPENINGS ( � ( R Tf-AN �Q OR 4�a a SETT TANKS 0
<br /> � � ., ECO Sa LL E OLE O E NGS ON THE TANK SLAB SHALL BE INSTALLED �M11TH , -
<br /> �� SHALL. BE, DOUR ,E WALL TANKS OF FIBERGLASS REINFORCED PLASTIC FRP AS _ � DEEPER THAN CALCULATED AS PRECAUTION', IN N
<br /> L" (FRP) A l 1 CROWN FCONCRETE T PRCV T IO EVENT SHALL.. THE TANK BE BURIED LESS
<br /> .�,� /'2 O O PREVENT WATER INTRUSION INTO THE MANHOLE. a � .
<br /> c _ ? r
<br /> 7e TURBINE I M P T -
<br /> XCORPORATION, � IN TA TI NOF TANKS AND PIPING U B NE; SUM. SENSOR: SEE SHEET K4 �_ DETAIL 1 FOR LIQUID SENSOR DETAILS, PROBE TO THAN 4 0 BE FINISHED C.� MANUFACTURED BY XER ES INSTALLATION O E W L Q SECTION N C" K a.... _LOW F l�a ED GF�ADE" OR DEEPER THAN 7 0 BELOW FINISHED GRADE. SEE
<br /> . SEE. �ECT ON A O DWG, T �. THE AF�CC) FIELD ENGINEER WILL BE REQUIRED TO SIGN
<br /> SPECIFICATION Wf
<br /> I BE MOUNTED AT SIDE OF TANK WHERE PRODUCT PENETRATION RATION INTO SUMP IS MAD E A D LOW
<br /> �`� .SHAD. BE IN ACCORDANCE WITH ,�f E,CIFICATIC)N 13800 LATEST EDITION AS PROVIDED E D E ET U D N BE OFF N THIS IT M ON TI-I ANK IN T T � MANUFAC;TURERS INSTALE_ATION RECOMMENDATIONSa -ANY VARIATIONS !N SLOPE' FROM 1 4
<br /> � ro ,, m � -- � O E E T SALLA ION CHECKh.IST BEFORE CONTRACTOR WILL BE PAID. �
<br /> C�1 BY ARCO PETROLEUM PRODUCTS COMPANY, AND MANUFACTURERS INSTRUCTIONS. LOWEST PENETRATION FITTING WITHIN SUMP AREA. PER FOOT SHALL BE REPORTED TO THE FIELD ENGINEER,
<br /> "TAII J C 0
<br /> LjJ 47000
<br /> I
<br /> LI LEVEL, USF ACTT E SIPHON _., ._,_..
<br /> -� B - I INSTALLED) 20,
<br /> _ _ P >� GAL. R' OCTANE
<br /> T� 1 I B
<br /> 3
<br /> PRODUCT 21 S TA FUEL G E F3 DETAIL A OS ON
<br /> G TK3 2 4
<br /> Z ' _ Q cwt (IF N TALLER)
<br /> CIT�
<br /> U,
<br /> L .a.,,d 1 I WW t0 "° �A,# '"Y 4b„ " „ WP Afi P - ..,_�
<br /> C. ,. MP? MO I RING � 1 2 1 2 SUM YOKING Ld
<br /> 1 I ! UID P c g va PIPE P E LIQUID R E4-0
<br /> K2-11A
<br /> I C+ E NOT , I GAUGE _ SEE NOTE 1
<br /> f« ..� 2 x VE N _ " WR ) " LL 2 F» a - ENT �. ,,� G
<br /> 1 EE NOT B SS PO _ 1
<br /> O. �. ., 4 AND .
<br /> K LEVE UCE 2 a
<br /> C 10 Wa I INSTALL D 1 C 2 I 0
<br /> W I N a ,
<br /> S BLA EEL a
<br /> D LA TEFL` 1 4 I L ADA E ««
<br /> I I
<br /> A D CAP IN LL "0 0
<br /> A.:,M C N AINMEN L BOX
<br /> Nz-
<br /> -0
<br /> �0
<br /> _ _ _ _
<br /> 0 0
<br /> AT
<br /> _e --
<br /> L
<br /> �)' 0_ SA - L MANHOI CCESS 0 ERS
<br /> " T ELOW E SHALLE
<br /> C C, ID TIGHTD LOCK B E
<br /> `� 11 11
<br /> ks a1
<br /> N 2 UNIO WW
<br /> h - ► LxR 2Ba VxRa FOM .- R ,�
<br /> 0 � - p 2 _ � SC D BLACK ,I_ VR. FOM _ __ 2 U I
<br /> _ HEADE H E A
<br /> _ , _ _.__ __. _,.__ _._ a E L)E S LAC EEL
<br /> 1K -�1B _ T
<br /> 2 ON IN E IT 'AND L SID _•
<br /> BULKFI IF GE NOTTf(? 1 E3 ,
<br /> 22
<br /> BULK
<br /> D B T N MAN F. F D 22
<br /> FITTING � �VUVI`
<br /> L 10 IR L FD) FITTINALARa DETAIL 1 2 0
<br /> 2 OND TIC 1 CUf�R 1 STANAINACTI IPI dON
<br /> TK3 1 TANK L ,AUG SLOPE A SHOWN ON :2 0
<br /> IF INS LLED
<br /> ( � ,,. �"� DETAIL ' ON DWG, TK3-2
<br /> INAC SIfPMO ,
<br /> 4 X VAPOR VERY A FR
<br /> SLOP S `SHO N 1 f
<br /> cd
<br /> [)ETA 10 ON , TK3 IN SPIL ONTAINM
<br /> SEE E ALFIITL B X.
<br /> _
<br /> cd
<br /> CL
<br /> 4-1 LD. Plan View
<br /> 0 (TYPm SINGLE FILL) 14 15 16
<br /> G
<br /> --SEE NOTE 6
<br /> NOT TO SCALE, ii tW "
<br /> SEE NTE 4 1 2 TO 4 PVC THREADED cd
<br /> T I, 14" 1 S 1 W� , _ � ,� I m
<br /> RGd
<br /> (SEE NOTE ) 12 m 4 4 1, 2 TO Wp 32 I"De a 4 , ( PIPE CAP
<br /> STAT _ 1 1 S
<br /> 2 1 CABLE GRIP - 32 I.Dx hTC �� _ PPI . 1 S ALL ,OPENIN S
<br /> ( / MIN: TY a TYP. InI�: _ 012 -
<br /> S TYR. SEE NOTE 1 EALS SUPPLIED 2WW Y - A.C. PAVING
<br /> _ � 1,� MAX'.
<br /> W SENSOR
<br /> .: =
<br /> at
<br /> , 04
<br /> ,
<br /> m _
<br /> «
<br /> ,
<br /> ,
<br /> y .:.
<br /> m
<br /> W '^
<br /> ,aaa, ,.
<br /> P � � a R
<br /> R41
<br /> AC'RA
<br /> r
<br /> 3 F VEL .m t� P _ ,
<br /> aa e P GR V MI a
<br /> , �° P A EL,_ Nw
<br /> as m -�,. 3 EAGRA�FL EA .
<br /> ILLVA O, wp
<br /> n ^ �
<br /> a R
<br /> a ,
<br /> ,A ^ a P .
<br /> A F MI � P
<br /> SEAL O P
<br /> {{''++.RAV _ ..MIN..
<br /> a P m a m
<br /> F IT
<br /> m H
<br /> b
<br /> . F
<br /> k ' w
<br /> M a M oo¢Byy
<br /> 1 mP' rtw q
<br /> app Pa
<br /> P b .
<br /> a m-..,• m . tea—�--ry '",':
<br /> IN +n
<br /> ,. _m__ (� Pry 3 4 O N IT
<br /> 4 T .d
<br /> } C DU
<br /> V N
<br /> C' N "
<br /> 3 C DU
<br /> 2
<br /> 1
<br /> TY
<br /> P
<br /> N TE !
<br /> EaEpp+ O
<br /> ,.. ypy 0..a �....
<br /> 11
<br /> :, pin+
<br /> W 0. NOTE�, �prw 13) ,'
<br /> P SE NOTE 1e
<br /> E OP TO SU F O 3
<br /> G1�
<br /> 4
<br /> !� G a� tee.
<br /> 1 TY
<br /> f
<br /> J BOX ,
<br /> _ _ POINT
<br /> S Wa
<br /> LOW OI T
<br /> 1 SEE z' NOTE 3
<br /> (SEE NO T"
<br /> 2
<br /> X _„
<br /> a I P10
<br /> 3 F'VG PIPE EO EN �2) P IPS H N P I csa Pl O GNA TYWT SE L OFFE P , P C PIP P3 E OE
<br /> R
<br /> (
<br /> co
<br /> TOT BINE
<br /> U
<br /> T , TT.
<br /> A BOTTOM ,M
<br /> T
<br /> ELF� NOF 2 NOTEE ES G rccaEM MP RI S MP I7, Z
<br /> U ONTO N I
<br /> Me)j
<br /> � U .MC4 C K ST FG S ,_B A S E�LL ,� 4 ~ P r 12I LIPRasC I PR B 1 F3 Q BEIQU O SFE NE i 4
<br /> RISER PRIMED AND )
<br /> D
<br /> a.
<br /> 3
<br /> E NOTE:
<br /> S
<br /> t�
<br /> E N T ' 7 Wi EE NOTE 7
<br /> 1 a O E ,
<br /> 0 M SE
<br /> }
<br /> RAPPED TO CERA I I
<br /> T 4
<br /> NOTE 14
<br /> 4
<br /> 2 VENT
<br /> S
<br /> (SEE O E
<br /> x
<br /> 1
<br /> V.R PIPING, �-
<br /> 4 L �
<br /> �4TEE
<br /> L
<br /> T
<br /> BLACK STEEL ,�-",
<br /> B�
<br /> A
<br /> _ T L 1�`P m a
<br /> YP
<br /> A D qq««
<br /> 2 BELL X
<br /> RI P IP AFS
<br /> RIS f P„
<br /> T
<br /> SE W P E C 2 BEI...L X MALE
<br /> MA AP TYP.
<br /> L ADAPTER E E
<br /> 3 ADAPTER
<br /> 9W
<br /> 3 ,//
<br /> E N TE 13
<br /> 14
<br /> `, p
<br /> 12 MAX,
<br /> 177! 12 MA�Ca
<br /> �Wr BACK FIIMIm, p a a
<br /> INDICATES ANCHOR-- �
<br /> PEA GRAVEL
<br /> STRAP LOCATIONS CRUSHED ROCK ® a W
<br /> ✓ (WHEN REQUIRED) 4
<br /> I I AS PER TANK
<br /> I I I a
<br /> I I MANE<. P a i
<br /> I I ECS. (�TYPa� Pw�. . ^.�
<br /> I I II II �,
<br /> I EXTRACTOR FITTING
<br /> I I Fa \�
<br /> SEE NOTE:' .� . °'" BALI., FLOAT VALVE
<br /> IL I ! II 1
<br /> 8
<br /> EXTRACTOR FITTING 6ifS I I I
<br /> I � 1
<br /> �� � E:�AL_Ew. FLOAT VALVE�� � I_—
<br /> 1 4a a 9 1 1 1 � 1 �. mm
<br /> I 1 1 �� 1
<br /> I� I I I I � � � q
<br /> d�
<br /> .. "_
<br /> t t____
<br /> R II iI I IIcd T-- 0
<br /> �� N 0 C) cd
<br /> BLACK STEL_- I I I 0
<br /> SIPHON. PIPE III I I I I I
<br /> L. `r
<br /> ANNULAR SPACE I
<br /> TANK LEAK
<br /> 1�,,ETECTOR
<br /> IQUIDOBE I
<br /> 1
<br /> SEE NOTE 7
<br /> � 12"x12"x1/4" STEEL / �s
<br /> 00 R I STRIKER PL,.ATE-TYPn ALL Ei 4S
<br /> OPENINGS ON '
<br /> FIBERGLASS TANK
<br /> ^• a Ra R ,a
<br /> {(p �^/
<br /> l w
<br /> �"" "
<br /> ® a R
<br /> ^Ch R b < as
<br /> 16215 72ND AVENUE SOUTH
<br /> -ms 'R a a aaa q„. aWa. epw awAa i
<br /> n, - .. rt _
<br /> a i
<br /> Pa R as P Rgrt • F �^^ R PEA GRAVEL/0
<br /> TA K SHALL V a ,a• S a p R.a >m° Q a " w SENT WASHINGTON) 251960 2
<br /> 0 TRAPPER SCREEN TYPw SEE NOTE 0 N S _L BE SFT DEAD LEVEL SFE NOTE G
<br /> �" aa�aa , R a R a,�an Rim a�aa a awR �Prt b F ( � �, ^p^� P*�a a.�am"i� exam"a "rte. a�'a:° . CRUSHED
<br /> aaka m^ Penm mmP ea aP"@ ^ aw^ a
<br /> OR SLOPE 1 MAX. O ANNULAR SPACE PROBE- ��� ) z1,_�222
<br /> __�.. .��.« p R a a ,�• : " mm� ^a^�4 a �" ROOK BED
<br /> ^ W.� ^a e.� aa�,e^gym � ^� a ,"�
<br /> m ^ a a
<br /> in,
<br /> c ; 2°--0>' MINe TANK SIZE VARIES WITH MANUFACTURER AND MODEL NUMBER END OF TANK
<br /> r
<br /> ahmm date
<br /> C-L Nj,S,
<br /> EXCAVATION
<br /> °— 'W MIN. N.T
<br /> ONLY �XC. VATION �NL"( 10/1/97
<br /> THIS DESIGN`ARRANGEMENT I TYPICAL FOR DOUBLE WALL. FIBERGLASS
<br /> TANKS. SEF SITE PIPING PLAN AND MATERIALS LIST ON DRAWING DFA 4 CYT xa
<br /> drawn b�
<br /> _� ._._, __..m__n.�__.�._._,-�,.,�.__�r.m.,e._,_�-,�-_.-- ��_ �_�_.._______....____�� .�,,....._.._..n_ ._.�..,_� p
<br /> TK4-3 FOR ACTUAL MANUFACTURER CHOSEN' FOR THIS PROJECT C)•T/27/k99 Ca) o
<br /> PEFW 7-1—r-1
<br /> f
<br /> z END 2186
<br /> (r Underground Tank Section
<br /> Ld
<br /> T
<br /> c " N T SCALE: SEE: NOTE` #3
<br /> F:\SR: P \1 \MECHAN \1ANKS\2022\2022'-„21B 10/10/97 1.52 Pm DLS
<br /> AR4,/ 2321A"DWG
<br />
|