My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
REMOVAL 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 2:09:22 PM
Creation date
3/26/2019 10:53:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1999
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. - TESTING OF THE SECONDARY CONTAINMENT PIPING IS REQUIRED. THE: SEALING 13. - ALL U,G. CONDUIT TO TANKS SHAT L BE SCHEDULE 40. PVC CONDUIT MAY BE SUBSTITUTED - 1 <br /> Sheet Notes BOOT IN THE SUMP IS TO BE INSTALLED WITH THE VALVE TURNED DOWN. AFTER 8. - A CERTIFICATE OF APPROVAL SHALL BE FURNISHED WITH EACH PREFABRICATION ASSEMBLY FOR GALVANIZED EXCEPT FINAL 2 -0" TO ANY LOCATION. PVC CONDUIT MINIMUM BURY <br /> 1. - SUMP PIPING PENETRATIONS SHALL BE MADE USING BULK HEAD FITTINGS TESTING THE VALVE IS TO BE OPENED TO ALLOW DRAINAGE OF THE SECONDARY CERTIFYING THAT THE ASSEMBLY OR STRUCTURE IN QUESTION HAS BEEN INSPECTED MEETING DEPTH IS 24 PER CODE, ;fir <br /> PIPING TO THE SUMP MONITOR PROBE. THE REQUIREMENT OF THE CODE. <br /> ("ENVIRON'). ELECTRICAL PENETRATIONS SHALL BE MADE 14, - ALL RISERS SHALL BE GROUNDED AND BONDED PER DETAIL #4 ON DWG. TK4-2. <br /> WITH APPROPRIATE AIR TIGHT COMPRESSION FITTINGS WITH SEAL-OFFS. 5. - ALL PENETRATIONS OF THE SUMP TO BE ON A LINE TOWARD THE CENTER OF THE SUMP 9. - TANK STABILITY SHALL BE CHECKED AGAINST FLOATATION. <br /> (I.E. ENVIRON), TO ENSURE THE PROPER INSTALLATION OF ALL BULKHEAD AND COMPRESSION FITTINGS AND 15. - FOR A 20,000- GALLON 10' DIAMETER TANK, THE ANNULAR <br /> RESULTANT WATER TIGHTNESS. ALL PIPING, CONDUIT AND GROUNDS THAT PENETRATE 10. - NOT USED. SPACE RISER IS LOCATED ON THE FILL SIDE AS SHOWN. <br /> .z 2. - THE HEIGHT OF PENETRATIONS INTO SUMP FOR SIPHON PIPING VARY BETWEEN TANKS. THE SUMP SIDE WALLS MUST BE SEALED IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY <br /> pz SEE DETAILS #6, #7 & #8 ON DWG. TK3-2 FOR TANK SIPHON PIPING DETAILS. TESTED WITH STANDING WATER FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS 11. - FOR ALL METHANOL COMPATIBLE STORAGE SYSTEMS, ALL READILY ACCESSIBLE COMPONENTS 16. -- TO CALCULATE TOP OF TANK ELEVATION, START WITH 18" MINIMUM DEPTH OF VAPOR <br /> Q ARE WATERTIGHT. THE ARCO FIELD ENGINEER MUST SIGN OFF ON THIS TESTING ON THE TANK WHICH ARE NOT METHANOL COMPATIBLE FOR THE IMMEDIATE INTENDED SERVICE SHALL BE RECOVERY LINE AT THE FARTHEST DISPENSER AND SLOPE 1/4" PER FOOT MAXIMUM TO <br /> a 2 INSTALLATION CHECK LIST BEFORE CONTRACTOR WILL BE PAID. <br /> RETROFITTED TO THE FUELS INTO THE STORAGE SYSTEM. 1/16" » <br /> 3. - TANK(S) SHALL BE UNDERWRITERS LABORATORY APPROVED AS CALLED FOR ON THEPER FOOT MINIMUM. ADD 12 AT THE TANK. ADD 13" (FOR 3" PIPE) OR 8" (FOR 2") <br /> 1 O W �SFTE SPECIFIC DRAWING OR AS DESIGNATED ON THE SUPPLEMENTAL CONDITIONS AND 6. - THIS DIMENSION IS CRITICAL AND MUST BE ADHERED TO. CONTRACTOR WILL BE REQUIRED TO t2, _ ALL MANHOLES ON THE TANK SLAB SHALL BE INSTALLED WITH A 1-1/2" CROWN OF CONCRETE FOR A CHANGE IN PIPING DIRECTION OTHER THAN 90' OR 45 . SET TANKS 6 DEEPER THAN <br /> z p w SHALL BE DOUBLE WALL TANKS OF FIBERGLASS REINFORCED PLASTIC FRP AS REINSTALL AT OWN EXPENSE OR WILL BE BACK CHARGED FOR EXPENSE TO CORRECT INCONSISTENCIES. CALCULATED AS PRECAUTION, IN NO EVENT SHALL THE TANK BE BURIED LESS THAN 4'-0" <br /> ( TO PREVENT WATER INTRUSION INTO THE MANHOLE. SEE SECTION A ON DWG. TK3-5. <br /> Q O p BELOW FINISHED GRADE OR DEEPER THAN 7'-0" BELOW FINISHED GRADE. SEE MANUFACTURERS >+ <br /> MANUFACTURED BY DANCE CORPORATION. INSTALLATION OF TANKS AND PROVIDED <br /> 7• - SEE SHEET TKRODUCT ENET PROBE COUPLING DETAIL. PROBE TO BE MOUNTED T SIDE OF THE ARCO FIELD ENGINEER WILL C REQUIRED I SIGN OFF ON THIS ITEM ON THE TANK C > Q <br /> SHALL BE IN ACCORDANCE WITH SPECIFICATION 13800 LATEST EDITION AS PROVIDED TANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW LOWEST -PENETRATION INSTALLATION CHECKLIST BEFORE CONTRACTOR WILL BE PAID. INSTALLATION RECOMMENDATIONS. ANY VARIATIONS IN SLOPE FROM 1/4 PER FOOT SHALL <br /> p N = BY ARCO PETROLEUM PRODUCTS COMPANY, AND MANUFACTURER'S INSTRUCTIONS. FITTING WITHIN SUMP AREA. BE REPORTED TO THE FIELD ENGINEER. C C .^ <br /> < TANK LEVEL GAUGE ' 8., g„ - co 0 4 <br /> L�. N 20 B (IF INSTALLED) Q N 4) <br /> -V p z PRODUCT 21 22 TK3-1 u° 47t <br /> Ad W Z 16-1 2' 6-i 2" SUMP MONITORING 4" PIPE PLUG w I N U .0 <br /> WI= 4'µ 22 REF REF 18 LIQUID PROBE IF GAUGE NOT � g o: w O 0: C 8. <br /> = V) (SEE NOTE #7) INSTALLED) 3 O W <br /> F- Z N 2„ F.G. VENT - I 11 I °>d I O E5 V c <br /> W p 101 18 & CAPVAN SPIPOR LL RECOVERY ADAPTER <br /> ER p a �A Q C G <br /> 3 U p w 10 NEW 2" UNION TANK LEVEL GAUGE I FILL BOX. Ii vJ (� <br /> Zp J s SCR'D BLACK STEEL (IF INSTALLED) zl it Q ' ` v <br /> L'j CD 12 24 12 I 13 m <br /> Z O 5 °° _ O Q 0 <br /> N T <br /> pU p p 7 ALL MANHOLE ACCESS COVERS - L <br /> E SHALL BE <br /> H p N 4" FILL ADAPTER 15 LIQTO UID TIGHT ANDD LOCKABLE • <br /> 11 AND CAP IN SPILL (V <br /> 1E to Q NEW 2" UNION CONTAINMENT FILL BOX - w <br /> F, \ SCR'D BLACK STEEL _ C <br /> p�p A - __ - 2" V.R. FROM - - - - - - - - - - - A O o <br /> ��z TK2-1 HEADER 8 6" ACCESS PORT TK2-1 / \ V' <br /> 1- O O Ld BULKHEAD 22 TK3-1 1.1. <br /> p Z FITTING I 20 <br /> K � <br /> z 0_ Q L'- : 21 ACTIVE SIPHON <br /> cd <br /> SLOPE AS SHOWN ON <br /> 4"x 3 4" GALV. REDUCING - DETAIL #10 ON DWG. TK3-2 SEE NOTE #2 Q U <br /> TEE (/74- GALV. PLUG 8A 6 SET AT 6" MIN. Pian View <br /> 12" MAX. 14 15 16 — 4" PVC THREADED co <br /> 12 9 4 18" - NOT TO SCALE: ig' PIPE CAP yr <br /> CABLE GRIP 26" I.D. ><YP 12" MIN. CROWN SEE NOTE #6 TYP 12 N C <br /> C-H CGB 293 TYP TYPTY ALL OPENINGS) 4-1 2" TO 6" G <br /> ( ) $ TE 12 . / A.C. PAVING <br /> EE NO # _ cd, <br /> _ • • • ^ <br /> L <br /> t: :t' :1' :i' :'s' s :i• :i' :i' .Y :i' .i' :'v' :i' :}' :V :V <br /> SEAL OFF 1 3" MIN. :i' • _ • c <br /> I ' I <br /> 3/4" CONDUIT � 1 <br /> (SEE NOTE #13) <br /> 3/4" GOND. 1 <br /> LOOP TO SUMP 1 23 SEAL OFF (TYP.) 5 GALLON SPILL 23 <br /> (SEE NOTE #13) 3/4"C & J-BOX SEE 3/4" CONDUIT. CONTAINER WITH SEE <br /> N HHppyy,rrTO TURBINE NOTE '� (SEE NOTE #13) 9N LINE DRAIN NOTE #1 Z <br /> INTHIS VEFORD CLARINN 4" GALV. RISER - Q #1 END' OF RIGID CONDUIT 4" BLA K S) - SEAL <br /> RISER �TYP.) W <br /> ® 21 I4"' x' 24" L BLACK STEEL (SEE NOTE #14) OFF I 25 f " <br /> PRIMED AND WRAPPED 1 <br /> SEE NOTES <br /> OTES 10 RMSER W/ PIPE CAP / <br /> 70 GRADE (SEE NOTE #14) LOOP BDETK'EEN J-BOX , • " + :, <br /> 2" VENT & V.R. PIPING (SEE NOTE #15) TANKS IF GAUGING - �` - <br /> ___ TURBINE CONTAINMENT AND FILL SIDE SUMPS <br /> 2 (FURNISHED BY TANK MANE) FIELD BOND TO NOT INSTALLED - <br /> Q N 2" BELL & FNPT TANK COLLARS. SEE DETAILS M1 & #2 (W/ PULL STRING) - • ' , U '� <br /> ADAPTER I 3 m -0N DWG. TK3-1 FOR CURRENY STANDARDS (SEE NOTE #13): — 3 1 i" 14,• (� <br /> 23 <br /> - - J Q OJm <br /> -- - - — L_ <br /> LL I �„ UMP MONITOR W C <br /> g z • 2 <br /> ���i I 18 (LIQUID PROBE) W L <br /> Z ,iii I SEE NOTE. #7 ���� <br /> �`(`•Jl� //i I BALL FL AT VALVE I \\ 13 J <br /> 17 \\ \ Q co > <br /> FIL <br /> /NOTE: FOR SITES WITH I - BPEA ACK RAVE \\\ + <br /> N^ MORE THAN 12 FUELING I 11� III I CRUSHED R CK <br /> POSITIONS A SECOND 2 HP I I I AS PER TANK \ \ f" z •cd <br /> VARIABLE SPEED TURBINE I I I I I MANE. SPECS. \\ \ cf) cc '•"� <br /> WILL BE INSTALLED IN THE I I I ( I (NQ <br /> P.) \\ \ <br /> 10,000 GALLON 87 OCTANE I I I I <br /> / / COMPARTMENT AND <br /> SEE NOTE #3 o <br /> MANIFOLDED WITH THIS I I III I \\ \ J 0 C <br /> I / I TURBINE I I I I I I \\ \ a <br /> 4 5 6 7 8 9 10 11 18 1 I 14 15 16 17 18 19 20 �,II � 00 <br /> co <br /> - I I - - - - - Iii - 00 0 O <br /> ill II I I 1 I ' c <br /> �1 I III I I 1 I �l 1 N Q Q <br /> IN1-N O W a <br /> G \ \\\ ANNULAR SPACE I 111 I I I I - // / Y (`7 W N. I-"O <br /> \ \ TANK LEAK I I I I I I <br /> LJ \ \\\ DETECTOR <br /> a \\\ PROBE) <br /> #7 I 2" BLACK STEEL r - !/ �GHA(�� - <br /> \ \ SEE\ I I SIPHON PIPE 1/4" STEEL PROTECTION M� <br /> PLATE-TYP. ALL - 456 /%/ co <br /> \ I OPENINGS ON <br /> W <br /> o � I FIBERGLASS TANK <br /> \ \\ <br /> NO <br /> 4 1v62°15 nNp nvE°N 'soim <br /> TANK SHALL BE SET DEAD LEVEL PEA GRAVEL/ i�• <br /> +,''"••• "'r• °'•'•L. CRUSHED KEN( WASHINGTON 98032 <br /> OR SLOPED 1" MAX. TO ANNULAR SPACE PROBE ^• ROCK BED (406) 2s1-6222 <br /> 2'-0" MIN. TANK SIZE VARIES WITH MANUFACTURER AND MODEL NUMBER END OF TANK 2'-0" MIN." - BCE# ---- <br /> O- N.T.S. eF rel6ase date <br /> EXCAVATION .. EXCAVATION ONLY <br /> ONLY <br /> T THIS DESIGN ARRANGEMENT IS,TYPICAL FOR DOUBLE WALL FIBERGLASS NO. ARCO PRODUCTS OOMPAN'l MASTER REVISIONS <br /> Ld <br /> TANKS. SEE SITE PIPING PLAN AND MATERIALS LIST ON DRAWING NO DATE REVISIONS PROJECT RELEASE _ pr(*exe.' drawn by <br /> TK4-3 FOR ACTUAL MANUFACTURER'S CHOSEN FOR THIS PROJECT 4/27/99 J,V, <br /> z <br /> Underground Tank Section �°' 'g6 <br /> E : <br /> W NOT TO SCAL <br /> z SEE NOTE 03 COW. <br /> WAG-BUILT TK2-1B <br /> A of <br /> AR924\92321 B.DWG <br /> File: 2023-218 <br />
The URL can be used to link to this page
Your browser does not support the video tag.