My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
522
>
1600 - Food Program
>
PR0543471
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2021 9:09:37 AM
Creation date
3/26/2019 1:52:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0543471
PE
1624
FACILITY_ID
FA0024674
FACILITY_NAME
STARBUCKS #6970
STREET_NUMBER
522
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
522 N EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />INSTALLATION, CONT’D.: REAR PANEL REMOVAL / SHIMMING / SEALING <br />Refrigeration Assembly <br />Rear View Wicking Material <br />To Be Held in <br />Place With <br />Prongs <br />Use shims to level case. <br />After case is in position and shimmed, it must be <br />sealed to floor with continuous bead of silicone caulk <br />to prevent entry or leakage of liquid or moisture. <br />See below-right illustration of frame support rails. <br />--- Case Rear View / Rear Panel Removed (Shown Below) --- <br />Rear Panel <br />Screw Locations <br />Power Cord <br />Route <br />Rear <br />Panel <br />Caution! Risk of electric shock! Only certified <br />electricians are to access electrical components. <br /> <br />3. Rear Field Access <br />Note: Access to case rear AFTER installation is <br />extremely limited (without pulling case out from wall). <br />To access components at rear of case, remove rear <br />panel retaining screws (see illustration below). Lift <br />panel up and off case rear. <br />While rear panel is removed, (and before moving case <br />into position), check that evaporator pan is positioned <br />directly under condensate drain. <br />Also, before moving case into position, plug cord into <br />wall (or field wire). See illustration at right. <br />Caution! To assure proper airflow, replace rear panel <br />when done. <br />Slide case into proper merchandising location. <br /> <br />4. Frame Support Rails Must Be Shimmed and <br />Sealed To Floor <br /> <br />Shims will be provided for all cases that have frame <br />support rails. <br />Note: After case is in position and shimmed, it must be <br />sealed to floor with continuous bead of silicone caulk to <br />prevent entry or leakage of liquid or moisture. <br /> <br />4” x 4” Field Wiring Box <br />Location (For Hardwiring) <br /> <br />Power Cord <br />& Plug
The URL can be used to link to this page
Your browser does not support the video tag.