My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. BP West Coast Products, LLC <br />Electronic Leak Detector Test Data Sheet <br />SS#: 2185 Date: IM212005 <br />Address: 3212 N CALIFORNIA <br />STOCKTON, CA 95204 <br />Test Information <br />Comments: <br />chi j,�n nf� car .x �roa—�,�A:Qs <br />r <br />This letter certifies that the annual leak detector tests were performed at the above <br />referenced facility according to the equipment manufacturers procedures and <br />limitations and the results as listed are to my knowledge true and correct. The <br />mechanical leak detector test pass/fail is determined using a low flow threshold trip <br />rate of 3 gph at 10 PSI. <br />Inspected By: Contractor: Tait Environmental Systems <br />Technician I.ic# <br />Signature: <br />1 2 3 4 5 <br />Product <br />1t / <br />Manufacturer <br />(1 ?L-,S— <br />'2'SModel <br />Model <br />eL <br />Line Bleed Back (ml) <br />Check Valve Holding Pressure (psi) <br />r----- ^�� <br />Test Leak Rate (ml/min) (gph) <br />PASS or FAIL <br />Comments: <br />chi j,�n nf� car .x �roa—�,�A:Qs <br />r <br />This letter certifies that the annual leak detector tests were performed at the above <br />referenced facility according to the equipment manufacturers procedures and <br />limitations and the results as listed are to my knowledge true and correct. The <br />mechanical leak detector test pass/fail is determined using a low flow threshold trip <br />rate of 3 gph at 10 PSI. <br />Inspected By: Contractor: Tait Environmental Systems <br />Technician I.ic# <br />Signature: <br />
The URL can be used to link to this page
Your browser does not support the video tag.