My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UGL o. va uC:l�p uarrie Brown (209) 461-6342 P.1 <br />14 OFA RC"O Products Company <br />Electronic Leak Detector Test Data Sheet <br />Station i4 Date � 20 <br />Address <br />Test Information <br />Comments: <br />This letter certifies that the annual leaf: detector tests were performed at the above referenced facility <br />according, to the equipment manufacturers procedures and limitations and the results as listed are to niy <br />111-noMedus: if -Lie arid correct. The mechanical leak detector test PaW all 19 determined usinL, a lou 110%.4 <br />ihreshold i rip rate of 3 8ph at 10 PSI. <br />inspected By. Contractor (/�%'� ��JL <br />-- hT <br />6 l.i Cis C <br />Technician__ <br />Signature <br />P,.oducr <br />a, <br />R7 anu "actu rer <br />_.. <br />l <br />— <br />I <br />N-Iodel <br />Line Educe' Hack (ml) <br />}� <br />Check Valve Holding, Pressure <br />{p_sil <br />^ <br />test Leak Rate (trl/min) (gph) <br />PASS ar ['AIL <br />i <br />Comments: <br />This letter certifies that the annual leaf: detector tests were performed at the above referenced facility <br />according, to the equipment manufacturers procedures and limitations and the results as listed are to niy <br />111-noMedus: if -Lie arid correct. The mechanical leak detector test PaW all 19 determined usinL, a lou 110%.4 <br />ihreshold i rip rate of 3 8ph at 10 PSI. <br />inspected By. Contractor (/�%'� ��JL <br />-- hT <br />6 l.i Cis C <br />Technician__ <br />Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.