Laserfiche WebLink
Page -.6— of -- <br />7. Uv..,ER-DISPENSER CONTAINMENT (Ui,.) TESTING <br />Test Method Developed By: UDC Manufacturer ❑ Industry Standard ® Professional Engineer ❑ <br />Other (Specify) <br />Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br />Other (Specify) <br />Test Equipment Used: Wayne Perry Inc. See Attached Testing Results Equipment Resolution: .00007 <br />Under -Dispenser Containment Number Below <br />1-7- 3- S - -7 <br />UDC Manufacturer: <br />Tq L w mBly <br />UDC Material: <br />UDC Depth: <br />2 <br />•t <br />i t <br />�( <br />" <br />Height from UDC Bottom to Top <br />tt <br />of Highest Piping Penetration: <br />10 <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />testing: <br />00:0 <br />1 <br />Portion of UDC Tested' <br />2" Above Highest <br />2" Above Highest <br />2" Above Highest <br />2" Above Highest <br />Penetration <br />Penetration <br />Penetration <br />Penetration <br />Does turbine shut down when <br />❑ Yes ❑ No NAN <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />UDC sensor detects liquid. <br />Turbine shutdown response time <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NAM <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NAM <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />❑ Yes ❑ No NA® <br />Wait time between applying <br />pressure/vacuum/water and <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />15 Minutes <br />starting test <br />Test Start Time: <br />;ZO ;22— <br />-7:2.(l 7:S7 <br />Initial Reading (Rj): <br />/6.6Sy$ OpkS-1>0 <br />$•200 12.3135 <br />Test End Time: <br />T : 3s :37 <br />Final Reading (RF): <br />It. 6SyS Z• 63�L <br />• ZUO 1 Z• 3i <br />Test Duration: <br />15 Min 15 Min <br />15 Min 15 Min <br />15 Min 15 Min <br />15 Min <br />15 Min <br />Change in Reading (RF-RO: <br />6-000-37— , 0=66 <br />o . boo= d • OW 1 <br />Pass/Fail Threshold or Criteria: <br />-0.0020 -0.0020 <br />-0.0020 -0.0020 <br />-0.0020 -0.0020 <br />-0.0020 <br />-0.0020 <br />Test Result: <br />H Pass ur Pass <br />z Pass ®- Pass, <br />[I Pass . ❑Pass <br />p Pass <br />❑Pass <br />❑Fail ❑Fail <br />0- Pail ❑ Fail-❑' <br />Fail ' ❑ Fail <br />❑Fail '. <br />❑Fail <br />Was sensor removed for testing? <br />❑ Yes ❑ No NAE] <br />❑ Yes ❑ No NA❑ <br />❑ Yes ❑ No NA❑ <br />❑ Yes ❑ <br />No NA❑ <br />Was sensor properly replaced and <br />❑ Yes ❑ No NAE] <br />❑ Yes ❑ No NA❑ <br />❑ Yes ❑ No NAE] <br />❑ Yes ❑ No NAE] <br />verified functional after testin ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />BP/Arco #02186 <br />3212 N California <br />Stockton, CA. 95204 <br />N04731 — SB 989 Testing <br />