My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PRESCOTT
>
13771
>
2800 - Aboveground Petroleum Storage Program
>
PR0515663
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:51:29 AM
Creation date
3/26/2019 3:46:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515663
PE
2832
FACILITY_ID
FA0010178
FACILITY_NAME
Wilbur-Ellis Company LLC: Manteca
STREET_NUMBER
13771
STREET_NAME
PRESCOTT
STREET_TYPE
Rd
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
13771 Prescott Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILBUR-ELLIS" <br /> April 11, 2019 <br /> Lydia Baker <br /> Registered Environmental Health Specialist <br /> San Joaquin County <br /> Environmental Health Department <br /> 209-468-8257 <br /> lbaker(&sicehd.com <br /> Dear Ms. Baker: <br /> This letter is in response to the Routine Inspection of the SPCC plan for Wilbur Ellis Co.- Manteca, CA on March 11, <br /> 2019. This letter intends to provide documentation to substantiate that the areas of concern listed on March 11, <br /> 2019, inspection report have been addressed. <br /> Below is a summary of the actions taken by Wilbur-Ellis to address the concerns listed. Any associated supporting <br /> documentation is also referenced in summary below, and the referenced supporting documentation is attached. <br /> Please note that all actions/changes to the SPCC Plan have been submitted to our certifying Professional Engineer— <br /> Geosyntec. The updated and certified copy will be delivered to you when available (target for April 30, 2019). <br /> 1. Item#301 —Six smaller storage tanks were not included in the SPCC Plan Tank Inventory;the Spray Oil <br /> Tank Capacity listed in CERS was inconsistent with the SPCC plan amount. <br /> ➢ 4/8/19:Wilbur-Ellis contacted Geosyntec (PE Review and Creator of the SPCC plan for this site) and noted the <br /> additional tanks to be added to the inventory list. The updated and verified SPCC Plan will be sent for your <br /> record once certified by Geosyntec. Target Completion by April 30, 2019. <br /> ➢ 4/5/19: Wilbur-Ellis verified the capacity of the Crop Oil tank at 15,000 gallons and updated both the SPCC Plan <br /> and CERS information. The tank capacity has been included in the annual HMBP Hazardous Material inventory <br /> submission. Once finalized and submitted,we will send you a copy. Target Completion by April 30, 2019. <br /> 2. Item#609—The SPCC Plan did not list the California Office of Emergency Services,only the Wilbur Ellis <br /> "Spill Center" Phone Number. <br /> Ideas to Grow With <br /> ■r— <br /> AGRIBUSINESS <br /> AG NESS � CONN ELL RS Q*401p, FEED <br /> DIVISION SPECIALTY <br /> CHEMICALS& <br /> DIVISION <br /> INGREDIENTS DIVISION <br /> 16300 Christensen Rd.Suite 135 Tukwila,WA 98188 T 206.988.5394 EHSS@wilburellis.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.