Laserfiche WebLink
2 <br /> ➢ 3/15/19:Wilbur-Ellis employees are trained to contact our Spill Center,who then directs them on which, if any, <br /> regulatory notifications are required. This is a 24-7 service with dedicated staff for Wilbur Ellis. The Emergency <br /> Contact sheets have also been updated to include the CAL OES phone number. (Attachment— Emergency <br /> Contact List - Manteca 3.2019) <br /> 3. Item#618— Records for procedures, inspections and integrity tests for the Crop Oil Tank. <br /> ➢ 3/27/19:Wilbur-Ellis contacted Powers Engineering to inspect and conduct the necessary integrity tests for the <br /> tank. Their findings report and certification area attached for your review. These will be conducted according to <br /> the Tank Farm Management program moving forward. (Attachment - STI-SP001 External Inspection Wilbur <br /> Ellis Tank 4038 Manteca CA 2019 RevO (1)) <br /> 4. Item#726—The Overfill Prevention gauges noted in the SPCC plan were removed from the Crop Oil Tank. <br /> Choose and install Overfill Prevention for the crop oil tank. <br /> ➢ 4/1/19:Wilbur-Ellis purchased & installed the Liquidator-2 Tank Guage from Rain Harvest. The gauge allows <br /> remote detection of real-time liquid levels. The SPCC update will note this system and the frequency liquid <br /> levels are physically verified in addition to team members watching during tank filling. (Attachment - Oil <br /> Guage& Pictures of installation) <br /> If you have any questions or concerns related to the actions taken by Wilbur-Ellis or the enclosed attachments, <br /> please contact me directly via email or phone. Thank you. <br /> Sincerely, <br /> Damon Gordon, <br /> Operations Manager—Wilbur Ellis Manteca, CA <br /> dgordon@wilburellis.com <br /> 209-992-7344 <br /> Ideas to Grow With <br /> 16300 Christensen Rd.Suite 135 Tukwila,WA 98188 T 206.988.5394 EHSS@wilburellis.com <br />