My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PRESCOTT
>
13771
>
2800 - Aboveground Petroleum Storage Program
>
PR0515663
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 11:51:29 AM
Creation date
3/26/2019 3:46:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515663
PE
2832
FACILITY_ID
FA0010178
FACILITY_NAME
Wilbur-Ellis Company LLC: Manteca
STREET_NUMBER
13771
STREET_NAME
PRESCOTT
STREET_TYPE
Rd
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
13771 Prescott Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 SPCC OPERATIONAL PROCEDURES <br /> The following preventative maintenance and operational procedures are implemented by Wilbur-Ellis to <br /> prevent oil discharges during the handling, use,or transfer of oil products at the facility. <br /> 5.1 INSPECTIONS, TESTS,AND RECORDS (40 CFR 112.7[e] & 112.8[c][6]) <br /> Facility personnel perform a variety of inspections and testing on oil storage equipment.These inspections are <br /> summarized in the Tank Farm and Wilbur-Ellis Tank Procedures,available on Weconnect.A blank copy of Wilbur- <br /> Ellis' annual Tank Farm Inspection From is also included in Appendix C. Copies of completed inspection forms <br /> for the last 3 years are kept at each facility. <br /> 5.2 PERIODIC INTEGRITY TESTING AND INSPECITON (40 CFR 112.8 [c][6]) <br /> Integrity testing and inspection procedures are summarized in the Tank Farm Program, available on <br /> Weconnect. <br /> 5.3 BRITTLE FRACTURE EVALUATION (40 CFR 112.7[i]) <br /> Wilbur-Ellis does not have any oil-containing ASTs that were constructed on site and,therefore,are not subject <br /> to brittle fracture evaluation requirements. <br /> 5.4 LOADING/UNLOADING AND TRANSFER OPERATIONS (40 CFR 112.7[h] AND 40 CFR 112.8[d]) <br /> These procedures are outlined in Fuel Tank Procedures, available on Weconnect. <br /> 5.5 RECORD KEEPING (40 CFR 112.7[e] and 40 CFR 112.8[c][3][iv]) <br /> The Wilbur-Ellis Record Retention Policy and Filing Policy, available on Weconnect, describes SPCC <br /> recordkeeping policies and procedures. <br /> 5.6 DRAINAGE OF DIKED AREAS (40 CFR 112.8[c][3]) <br /> Procedures related to drainage of diked areas are described in the Tank Farm Program,available on <br /> Weconnect. <br /> 5.7 VISIBLE DISCHARGES (40 CFR 112.8[c][101) <br /> Visible discharge from any container or appurtenances is quickly removed upon discovery to prevent <br /> accumulation of oil in diked areas. Corrections are promptly made including, but not limited to,the addition, <br /> replacement or tightening of any seams, gaskets, piping, pumps,valves, rivets or bolts which may have been <br /> deemed to cause the visible discharge. <br /> 13 June 07,2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.