My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 4:54:02 PM
Creation date
3/27/2019 1:36:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE I <br />TYPE OF ACTION 1. NEW PLAN El 2. CHANGE OF INFORMATION <br />MOI <br />M02 <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY <br />(Check one item only) El THIS PLAN COVERS ONLY THE FOLLOWING US I SYS I EM(S): <br />... ... ... . ZO*: ;'ION:: . .............. <br />Y RMAT <br />FACILITY ID # (Agency Uye Only) T 1 <br />FACILITY NAME ARCO # 02186 <br />FACILITY SITE ADDRESS 3212N CALIFORNIA M01 CITY STOCKTON <br />Mos <br />E r <br />-- State I . aw .. requires that testing, preventive maintenance, and calibration of monitoring equipment (e.g, sensors, probes, line leak detectors, etc) be performed in <br />M06 <br />accordance with the equipment manufacturers' instructions or annually, whichever is more frequent Such work must be performed by qualified personnel <br />mat <br />MONITORING EQUIPMENT IS SERVICED Z 1. ANNUALLY 0 99.01 HER (Specify): <br />1114 G LOCATIONS <br />This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i e , location ofeach sensor., <br />-, UST Monitoring Site Plan from a Monitoring System Certification <br />line leak detector, monitoring system control panel, etc ) If you already have a diagram (e current <br />form, Hazardous Materials Business Plan map, etc.) which shows all required information, include it with this ptan. <br />IV.. TAW MONITORING <br />Vfo <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />1 CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (IN IERSTIT IAL) SPACE(S) OR SECONDARY CON TATNMENT VAULI(S) <br />SECONDARY CONTAINMENT IS: 0 a DRY [Ib LIQUID FILLED 0 c UNDER PRESSURE D d UNDER VACUUM <br />Mir <br />M13 <br />PANEL MANUFACTURER: Veeder Root M" MODEL #: --- TLS350 <br />MIS <br />M14 794 390-407- <br />LEAK SENSOR MANUFACTURER: Veeder Root MODEL #(S): <br />❑ 2 AUTOMATIC TANK GAUGING (AIG) SYSTEM USED TO MONITOR SINGLE WALLJANK(S) <br />MI 7 <br />PANEL MANUFACTURER: M16 MODEL <br />M1IN-TANK <br />IN -TANK PROBE MANUFACTURER: MIS MODEL #(S): <br />V20 <br />LEAK TEST FREQUENCY: 0 a CONTINUOUS El b DAILY/NIGHTLY E] c WEEKLY MI -I <br />F1 d MONTHLY El e OTHER (Specify): <br />M22 <br />PROGRAMMED YES IS: El a 0 1 g p h 0 b 0 2 g p h E] c OTHER (Specify): <br />M23 <br />M24 <br />F-1 3 INVENTORY RECONCILIATION El a MANUAL PER 23 CCR §2646 El b STATISTICAL PER 23 CCR §2646 1 <br />F-1 4 WEEKLY MANUAL YANK GAUGING (MTG) PER 23 CCR §2645 <br />M25 <br />TESTING PERIOD: [I a 36 HOURS ❑ b 60 HOURS <br />F 5 INTEGRITY TESTING PER 23 CCR §2643 1 M26 <br />M,27 <br />TEST FREQUENCY: El a ANNUALLY 0 b BIENNIALLY ❑ c OTHER (Specify): <br />El 6 VISUAL. MONITORING DONE: F1 a DAILY 11 b WEEKL Y (Requires agency approved) <br />❑ 99. OTHER (Specify): <br />V. PIPE MONITORING <br />M30 <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />1 CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)[TRFNCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: 0 a DRY 0 b LIQUID FILLED ❑ c UNDERPRESSURE El d UNDERVACUUM <br />M31 <br />M331,34 <br />PANEL MANUFACTURER: Veeder Root ""' MODEL #: TLS 350 <br />Veeder Root MODEL #(S): 794-380-323 <br />M33 <br />LEAK SENSOR MANUFAC I URER: <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i e, TURBINE) SHUTDOWN? 0 a YES El b NO <br />M36 <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? 0 a YES Cj b NO <br />M" <br />[1 2 MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 30 g p h LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED MIS <br />M39 <br />MLLD MANUFACIURER(s): MODEL #(S): <br />19 3 ELECTRONIC LINE LEAK DETECTOR (E -LLD) THAT ROUrMLY PERFORMS 3 0 g ph LEAK TESTS <br />ELIDMANUTACTURER: RED JACKEI M40 MODEL CPT <br />11441 <br />M42 <br />PROGRAMMED LINE INTEGRITY TESTS: El a MINIMUM MON THL Y 0 2 g p h 0 b MINIMUM ANNUAL. 0 1 g p h <br />WILL ELID DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUT DOWN? Z a YES E] b NO <br />1143 <br />WILL ELID FAILURE/DISCONNECI ION TRIGGER AUTOMATIC PUMP SHUTDOWN? Z a YES El b NO <br />N141 <br />M 4 INTEGRITY TESTING M43 <br />M46 <br />TEST FREQUENCY: El a ANNUALLY El b EVERY 3 YEARS El c DIHER(SpeciPy)❑ <br />5.VISUAL MONITORING DONE: F] a DAILY F_] b WEEKLY* C] c. MN. MONTHLY & EACH TIME SYSTEM OPERATED - - <br />4 Requires aSmoy approval ** Allowed for monitoring ofunburied emergency generator fuel piping only per HSC §25291 <br />M47. <br />5(b)(3) <br />❑ 6 PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(a)(3) <br />El *7 NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED 1-0 THE UST(s) <br />M48 <br />[] 99. OTHER (Specify) <br />Arco # 02186, Betshire Environmental Services Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.