My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2007 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 4:54:02 PM
Creation date
3/27/2019 1:36:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2009
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN-03-2009 09 :07 AN GETTLER—RYAN INC. 925 551 4770 P. 04 <br /> Monitoring System Certification <br /> F. [n-`Cank GauYrng/ ti1R I?quipmertt: ® Cheek this box if tank gauging is used only for inventory control. <br /> ❑ (_'heck this box if no tank F:auging or SIR equipment is irls1311cd, <br /> This section must be completed it'in--tank gain inn equipment is used to perform leak detection 1710mitoringl. <br /> Complete the following checklist: <br /> 0 Yes ❑ No" Has all input wiring been inspected for proper entry and termination, including testing for gro.tnd faults? <br /> ® Yes D No* Were all tank gauging prohes visually inspected for damage and resirlue buildup'.' <br /> ® Yes D No* Was accwnacy of system product lei el readings tested" <br /> ® Yes 11 No* Was accuracy ot'systern water level readings tested" <br /> Z Yes ❑ No'" Were all probes reinstalled properly" <br /> ® Yes C.] No" Were all items on the equipment manufacturer's maintenance checklist completed`? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> C. Line Leak Detectors (I,I,D): ❑ check this box if L LDs are not installed. <br /> Com tete the foliowin checklist: <br /> -YtilY1M4./� <br /> 0 Yes ❑ No* For equipment start-up or annual equipment certification. was a leak simulated to verify i..t.I) perfgrmance, <br /> D N/A (Check all Mai apply) Simulated leak rate: ® 3 g,p,h.: r'7 0 1 g.p.h:L7 0.2 g,p,h, _-- <br /> 0 Yes 0 No* Were all L..LDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes C7 No* Was the testing apparatus properly calibrated? <br /> p Yes F3 No* For mechanical i-Lx does the ILD restrict product tlow iris detects a leak?_ <br /> Z N/A <br /> ® Yes [] No* For electronic L.LDs.does the turbine automatically shut Off if the LLD detects a leak`? <br /> _ D N/A ---- <br /> 0 Yes [.] NO For electronic LL.Ds, does the turbine automatically shut oft'if any por1lon Of the monitorinL, system is disabled <br /> ❑ N/A or disconnected'?F <br /> ❑ Na* For electronic LLDs. does the turbine aulomaticalIN shut orf if ,mv portion of the monitoring systemN/A malfunctions or fails a test'Q No* For electronic LLLDs. have all accessible wiring connectionti been visually inspected'? <br /> 0 N/A 0 No* PWLre all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: 91 Oct, shutdown occurred in approx 25 seconds 87 Oct shutdown occurred in approx 23 seconds <br />
The URL can be used to link to this page
Your browser does not support the video tag.