Laserfiche WebLink
CLIENT: <br /> PIPING LEGEND <br /> - - - - - EXISTING 2" F.G. DOUBLE WALL PRODUCT PIPING <br /> --- --------- EXISTING 2" OR 3" F.G. SINGLE WALL VAPOR RECOVERY PIPING <br /> EXISTING 2" F.G. SINGLE WALL VENT PIPING <br /> GENERAL NOTES ARC <br /> ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS NOTED OTHERWISE. P wESrCOAsrPRODUCrs LIC <br /> THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD <br /> FINISHES IN PLACE. ALLIANCE MANAGER, AGENT FOR BP: <br /> SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL EXISTING PRODUCT <br /> PIPING IS DOUBLE CONTAINMENT PIPE. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL PIPE. <br /> HEALY EVR PHASE II AND ISD UPGRADE INSTALLATION NOTES <br /> it <br /> it <br /> PROPERTY - 195'-9- EXISTING (1) <br /> ....... _,,,,,........,. .,,___— —,.._-------:,.........,,.,,.,_„-,mow— .,_..—--------------------------_ __ ...._ _-----_-------„,,,_--- „__ _------- 20,000 GALLON & (1) 10,000/12,000 SPLIT DOUBLE WALL TANKS AND PIPING SYSTEMS TO <br /> LINE <br /> \\ \ NOTIAUS THERE SHALL BE NO WOR PERFORMED ON ANY BURIED PIPING AS A PART OF THIS SCOPE. <br /> ......... <br /> i <br /> .... ED <br /> T . <br /> ;1 <br /> . ... : ,• <br /> ' f 2 <br /> GILBARCO B78 MULTIPRODUCT 1' ODUCT DISPENSERS TO REMAIN. NATIONAL SITE ADAPT CONSULTANT <br /> ,,#. � , ,• �. . , � 3 EXISTING 4 <br /> --”' ..1�„� / ,:• , ,, ,. ,� ,: ,: ; I � �: � .E O IN. CONTRACTOR TO REMOVE ALL EXISTING ' <br /> f <br /> __. ___......_...._................._<-,--_ .`'` DISPENSER HANGING HARDWARE & ASSOCIATED EQUIPMENT IN ORDER TO INSTALL NEW EVR PHASE II <br /> j --.--. l EQUIPMENT PER CARB EXECUTIVE ORDER VR-202 G H q <br /> i ( PUMP CONTRACTOR TO INSTALL NEW HEALY DISPENSER MOUNTED RETROFIT KIT WITH VP1000P VACUUM P S^ <br /> * CONTRACTOR T <br /> CO 0 INSTALL NEW HEALY VAC ASSIST HOSES, SWIVELS, NOZZLES, & BREAK-AWAY mSMM <br /> Z <br /> VALVES. <br /> * CONTRACTOR TO INSTALL NEW VEEDER ROOT ISD FLOW METERS AT ALL DISPENSERS. <br /> \, TOR TO PULL NEW MONITORING SENSOR CABLING THROUGH EXISTING CONDUIT <br /> ........................ <br /> .., , * <br /> CONTRACTOR RE-CONNECT TI <br /> _ * <br /> CONTRACTOR <br /> R TO R NNEC ALL E <br /> 0 E CO EXISTING ELECTRICAL CONDUITS AS REQUIRED. ys <br /> TOR TO INSTALL NEW VEEDER ROOT ISD PRESSURE SEN <br /> O <br /> TANKS. 1 SENSOR AT DISPENSER NEAREST THE <br /> NEW ISD PRESSURE 4 G ENG1N� <br /> SENSOR <br /> !EXISTING <br /> 7 INSTALL NEW BOLLARD __.___ A <br /> �� �� - CRETE p LL VERTICAL NEW CLEAN AIR SEPARATOR UNIT ON 4 0X4 0X8 MINIMUM K <br /> N <br /> „.,..,,,,,,,. I CON AD. THTC <br /> CONTRACT <br /> (TYP. 6 PLCS.) <br /> STORAGE f :: <br /> ONTAIN O LY K 251-6222 <br /> 032 <br /> EC 1” VENT LI <br /> "LAND PLANNING AND DESIGN <br /> SEE INSTALL NEW HEALY CLEAN AIR ""` REMOVE AND REPLACE TANKRTOVVENTOSTACKFMANIFOLDEPERI DETAISOLS 0 EE 1/8" PER FOOT FROM NEW HEALYCLEANAIRS <br /> clAusTs <br /> .18215 72ND AVENUE SOUTH <br /> 5 SEPARATOR TANK ON 4'x4'x8" SEPARATOR. CONTRACTOR TO VERIFY THAT EXISTING TANK VENTS ARE A MINIM ( ) <br /> 8 <br /> TK2-1 ............_W,,;:,_ EXISTING MONITORING UM OF 12' ABOVE GRADE <br /> ENT, WASHINGTON 98 <br /> 425 <br /> CONCRETE PAD W/ BOLLARDS CONSOLE 9 ? AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. INSTALL <br /> HEALY CLEAN AIR SEPARATOR TANK AND ASSOCIATED PIPING AND FITTINGS PER NEW CARB EVR P <br /> 6 (E) (3) 2" VENT RISERS it <br /> SEE DRAWING ELATION SHALL BE PER CAR 0 AND MANUFACTURERS INSTRUCTIONS <br /> _ PHASE II <br /> NO DA <br /> WING TK2-1 FOR DETAILS. <br /> W I <br /> STANDARDS AND <br /> E.O. VR 2 <br /> TE REVISION <br /> DESCRIPTION <br /> 02. INSTALLATION <br /> m.. <br /> B E <br /> —_.. <br /> NOTE: INSTALLATION SHALL MEET THE STATE APPROVED INSTALLATION INSTRUCTIONS FOR THE HEALY <br /> 1 7/21/08 PERMIT RELEASE <br /> i z <br /> ........,,. <br /> SYSTEMS INCORPORATED CLEAN AIR SEPARATOR AND THE STATE APPROVED IN-STATE DIAGNOSTICS s <br /> Lv INSTALLATION INSTRUCTIONS. <br /> 3 , <br /> 7; < <br /> . . e . ....... ...... <br /> Q I Ifl \ \\ - O W CONCRETE FILLED BOLLARDS IN LOCATIONS SHOWN. CONTRACTOR TO FIELD a <br /> "' W CONTRACTOR TO INSTALL NEW€„1 _I VERIFY THAT NEW BOLLARD LOCATIONS DO NOT COMPROMISE EXISTING UNDERGROUND PIPING OR UTILITIES. <br /> _ ARCO FACILITY #21 8 6 ` 00 Z FIELD ADJUST LOCATIONS AS REQUIRED TO AVOID ANY UNDERGROUND OBSTRUCTIONS. <br /> 4 r <br /> Z i i II ;% a �-� „ <br /> t <br /> CONTRACTOR TO REMOVE EXISTNG VEEDER ROOT MONITORING PANEL AND INSTALL NEW VEEDER ROOT <br /> z PLANTER of` �. I w Q O (TLS OR) PANEL AT THE EXISTING LOCATION. RE-LAND SENSOR WIRING IN NEW PANEL PER DETAILS & <br /> _ 35 <br /> J =I „ n,E.. z PROGRAM TO PANEL MONITOR TANK SUMPS, DISPENSER SUMPS, TANK LEVEL PROVE, ISD FLOW METER, S <br /> a. y �'� A ( ��I w 8 <br /> Q v �l, f ;. j ,,,,,,,,,,r,T Q PRESSURE SENSOR & TANK ANNULAR SPACES. <br /> �. <br /> I I � D <br /> a yv �••• � O VEEDER ROOT PANEL TO BE PROGRAMMED BY A CERTIFIED TECHNICIAN UPON COMPLETION OF UPGRADE <br /> D <br /> SERVICE. <br /> -. _,_..... ,._. _.- ” " ....._,,. �. ....._.,, -t ! � i � i; AND PRIOR TO PLACING EQUIPMENT BACK IN <br /> ;^ <br /> I 9 <br /> a i -' -.._.._--.... . ,,.,, _...,.._, ,..,,,_,. ......... .. ......._ .. .... ,.._._ a 0 10 WHERE EXISTING TURBINES SEkVE IN A MASTER AND SLAVE CONFIGURATION, CONTRACTOR TO REWIRE SUCH z <br /> I <br /> 3 <br /> ' THAT THE VEEDER ROOT AUTOMATIC TANK GAUGE DETERMINES WHICH TURBINE IS STARTED AS THE MASTER SEALOFESSIp <br /> it i <br /> it <br /> .. ... <br /> BASED ON THE LEVEL OF PRODUCT IN THE TANKS. SEE DRAWING TK3-2 FOR DETAILS QR N4( <br /> ... ... . .... . .... .. ........ <br /> - - - _ .................. <br /> CON1TRA <br /> t it ,_ ( HORITY FORWARD RESULTS TO OWNER AND TO JURISDICTION A <br /> ARB E 0 VR 202 E AND LOCAL <br /> it <br /> SEE 3 IN THE PERMIT CONDITIONS. S SPECIFIED J G4 <br /> CTOR TO PERFORM ALL REQUIRED VAPOR RECOVERY TESTING PER C <br /> i it <br /> AIR EPOLLUTION CONTROL AUT AND HA B <br /> it it <br /> it <br /> /it <br /> ! �4 m <br /> TK2-1 EXISTING AIR WATER UNIT <br /> it <br /> it <br /> XIS BARC 7 IN E ! O RETRO—FIT TO <br /> EHOSEGPERLSIDEOBLENDING 3E TRASH ENCLOSURE l tT Q <br /> NO NEW ELECTRICA LOA+OS ARE BEING NTRODUCED AS A RE ULT OF THIS PR JECT. CONTR CTO <br /> CONFORMANCEENSURE THAT AANDLL NMEETTS EW HEREQUI EMEN REQUIREMENTS CDECO2 07ESECTIONG5114 AS SPECIFIEDDISPENSERS LINBTHENPERMIT C/30 <br /> it L <br /> \,,' PRODUCT MPD'S TO REMAIN. /Q9 <br /> \\ CONVERT DISPENSERS VAPOR CONDITIONS. �q7 V 1 ��\ <br /> OF CA�FFO <br /> } RECOVERY SYSTEM TO HEALY EVR 13 CONTRACTOR TO FIELD VERIFY THE INSTALLATION OF (1) FIRE EXTINGUISHER MINIMUM RATED 2-1 20BC CONFIDENTIALITY STATEMENT-. <br /> tt PHASE II WITH ISD tt <br /> WITHIN LOCATION OF 75' TO 20' OF THE TANKS. ME RECIPIENT <br /> OF HESE MATERIALS UNDERSTANDS MAT <br /> (TYP. OF 4) <br /> COPYRIGHT IN ME MATERIALS IS OWNED BY BP, AND ALSO, <br /> t!( I `� THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL <br /> `\ ....... .. 3 BU9NENT IAGREES TON OF IN ACCORDINGLY, THE <br /> IN <br /> RECIPIENT AGREES r0 RETAIN THESE MATERIALS IN STRICT <br /> CONFIDENCE AND AGREES NOT TO AND <br /> FURTHER <br /> THESE <br /> MATERIALS TO ANY OTHER PARTY ANO FURTHER AGREES <br /> ? t \_„ „ ;• (/\_ [/�_ /!''�� NOT To MAKE COPIES OF THE MATERIALS. THE RECIPIENT I <br /> ...::::........ ..... ......._ COMPLIANCE NOTES AGREES TO USE THE MATERIALS ONLY FOR ME LIMITED <br /> ` �. ...._'.... .••� ---------------------........ ,._.. __,,,,.. ----.........._ - � PURPOSE FOR WHICH SP HAS MADE THE MATERIALS I <br /> a 3 AVAILABLE. AND RECIPIENT AGREES TO RETURN ALL <br /> ' ......._. rte,. _............ .................. .... 't\ l I ,iINTENDED <br /> N END DSPURPOSETO BP E OR UPON ITHER OTHE OREQUEST N OFF BP•E <br /> / """' """" "" - --- ,�\ ,_,, 1. ALL DIIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING <br /> , -.,_ :' WH HII S FIRST. v <br /> _ — fI....... ......... ......_.__......_..__...... -.... Y WORK. SHALL BE CALLED TO THE ATTENTION OF PIP AND TANK DESIGN DISCLAIMER- <br /> PETROLEUM <br /> e w. x <br /> _ AN K ANY DISCREPANCY THE OWNERS ENGINEER FORDIS IM <br /> PROPERTY LINE •, <br /> _19-5=� HIS DECISION BEFORE PROCEEDING WITH THE WORK. BE DOES NOT AND CANNOT WARRANT THAr ME PLANS FOR Z <br /> PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH <br /> ALL LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE Q <br /> 2. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR APPLIED IN HE FUTURE. NOR Does BE WARRANT HAT a <br /> FUELING STORAGE AND DELIVERY SYSTEM CONSTRUCTED IN <br /> i <br /> EXCAVATIONS OF TRENCHES 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO LEAKS <br /> CONFORMITY <br /> RE ACCORDINGLY STRONGLY ENCS OF <br /> O 4 <br /> \ i ,A I <br /> DESGEIIVD CONSULT WTH A FUELING STATION ENGINEER OF YOUR T DO <br /> J CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE <br /> \ \ "•, i : - PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTNG ME <br /> .........._...: l• ? J 'F STORAGE AND DELIVERY SYSTEM AT YOUR STATION. % <br /> . .........................._ ..... ... ..._..._ ..... ..._....... ._. ....... i <br /> .,..... _........ _.__. _..___ ........_...._ 3• D PURPOSE AS PER NATIONALLY DEVELOPMENT INFORMATION <br /> - ,.• ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED NATIO DE : II <br /> ""' <br /> RECOGNIZED CO CAL CODES AND GOVERNING DES, LO ERNING AUTHORITIES. <br /> UNDERGROUND STORAGE <br /> 4. FUELING SYSTEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS TANK STANDARDS <br /> REPRESENTATIVE PRIOR TO BEING PLACE BACK IN SERVICE. <br /> EVR PHASE II WITH ISD ° <br /> 5. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED V-8,02008 SERIES 12 <br /> DO <br /> N . CALIFORNIA STREET BY GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION (AS APPLICABLE). o <br /> CALIFORNIA MARKET <br /> 6. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING N <br /> ANNULAR SPACES OF TANK. sTE ADDRESS: <br /> 7. REFERENCED CODES SHALL INCLUDE 2007 CBC; 2007 CFC, ARTICLE 79; 2007 CEC; 2007 CMC. $212 NORTH CALIFORNIA <br /> 8. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2007 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL STOCKTON, CA <br /> BE PROVIDED. THE AUTOMATIC FIRE SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES. <br /> UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT. m <br /> 0 <br /> FACILJTY No.2166 <br /> DRAWING INDEX DESIGNED BY: ALLIANCE zaDM: F <br /> OHMIED BY: OV BP REPM: <br /> TK1-1 EVR PHASE II AND ISD UPGRADE SITE PLAN DRAVIN BY: �P AWANCE PM: a <br /> TK2-1 DISPENSER EVR PHASE II HANGING HARDWARE & ISD VERSION: PROJECT No 0 <br /> SENSORS, INSTALLATION AND EQUIPMENT V-8.0 BCE#13436 <br /> * TK3-1 NEW VEEDER-ROOT PANEL MONITORING WIRING DETAILS (EVR <br /> �(7�Y '� ,l PHASE II RETROFIT PROGRAM) DRAVANG TITLE _ <br /> EVR PHASE II AND ISD UPGRADE SITE PLAN TK3-2 ELECTRICAL FUELING WIRING DETAILS FOR VEEDER-ROOT & <br /> TYPICAL TURBINE SET-UP EVR PHASE II RETROFIT PROGRAM EVR PHASE II AND ISD o <br /> ( ) UPGRADE SITE PLAN <br /> SCALE: 1"=10'-0" <br /> DRAWING DISCLAIMER NOTE AOMD INFORMAMN Y <br /> THIS SITE PLAN HAS BEEN PREPARED WITHOUT BENEFIT OF TITLE REPORT, N0. FUELING POSITIONS: 8 SHEET N0 <br /> 1 00120 Call Toll Free SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS DOES NO. GASOLINE NOZZLES: 8 <br /> 1 (888) 258-0808 NOT WARRANT THE ACTUAL LOCATION OF PROPERTY LINES AND SETBACKS. IT IS NO. DIES I 0 <br /> TWO THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO VERIFY PROPERTYWORKIN �T,`II_',\ JLC (� E <br /> BEFORE DAYS LINES AND SETBACK DISTANCES WHERE THEY MAY AFFECT THE PLACEMENT OF TK1 <br /> M <br /> BEFODIG <br /> RE YOU NEW EQUIPMENT AS A PART OF THIS PROJECT, THE DRAWING REFLECTS n a <br /> EXISTING SITE CONDITIONS AS PROVIDED BY BP FROM ARCHIVE RECORDS. AUG 2 d 2008 H <br /> ENVIROWIEN I HEALTFI <br /> PERMIT/SERVICES <br /> Ii <br /> w <br />