CLIENT:
<br /> PIPING LEGEND
<br /> - - - - - EXISTING 2" F.G. DOUBLE WALL PRODUCT PIPING
<br /> --- --------- EXISTING 2" OR 3" F.G. SINGLE WALL VAPOR RECOVERY PIPING
<br /> EXISTING 2" F.G. SINGLE WALL VENT PIPING
<br /> GENERAL NOTES ARC
<br /> ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS NOTED OTHERWISE. P wESrCOAsrPRODUCrs LIC
<br /> THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD
<br /> FINISHES IN PLACE. ALLIANCE MANAGER, AGENT FOR BP:
<br /> SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL EXISTING PRODUCT
<br /> PIPING IS DOUBLE CONTAINMENT PIPE. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL PIPE.
<br /> HEALY EVR PHASE II AND ISD UPGRADE INSTALLATION NOTES
<br /> it
<br /> it
<br /> PROPERTY - 195'-9- EXISTING (1)
<br /> ....... _,,,,,........,. .,,___— —,.._-------:,.........,,.,,.,_„-,mow— .,_..—--------------------------_ __ ...._ _-----_-------„,,,_--- „__ _------- 20,000 GALLON & (1) 10,000/12,000 SPLIT DOUBLE WALL TANKS AND PIPING SYSTEMS TO
<br /> LINE
<br /> \\ \ NOTIAUS THERE SHALL BE NO WOR PERFORMED ON ANY BURIED PIPING AS A PART OF THIS SCOPE.
<br /> .........
<br /> i
<br /> .... ED
<br /> T .
<br /> ;1
<br /> . ... : ,•
<br /> ' f 2
<br /> GILBARCO B78 MULTIPRODUCT 1' ODUCT DISPENSERS TO REMAIN. NATIONAL SITE ADAPT CONSULTANT
<br /> ,,#. � , ,• �. . , � 3 EXISTING 4
<br /> --”' ..1�„� / ,:• , ,, ,. ,� ,: ,: ; I � �: � .E O IN. CONTRACTOR TO REMOVE ALL EXISTING '
<br /> f
<br /> __. ___......_...._................._<-,--_ .`'` DISPENSER HANGING HARDWARE & ASSOCIATED EQUIPMENT IN ORDER TO INSTALL NEW EVR PHASE II
<br /> j --.--. l EQUIPMENT PER CARB EXECUTIVE ORDER VR-202 G H q
<br /> i ( PUMP CONTRACTOR TO INSTALL NEW HEALY DISPENSER MOUNTED RETROFIT KIT WITH VP1000P VACUUM P S^
<br /> * CONTRACTOR T
<br /> CO 0 INSTALL NEW HEALY VAC ASSIST HOSES, SWIVELS, NOZZLES, & BREAK-AWAY mSMM
<br /> Z
<br /> VALVES.
<br /> * CONTRACTOR TO INSTALL NEW VEEDER ROOT ISD FLOW METERS AT ALL DISPENSERS.
<br /> \, TOR TO PULL NEW MONITORING SENSOR CABLING THROUGH EXISTING CONDUIT
<br /> ........................
<br /> .., , *
<br /> CONTRACTOR RE-CONNECT TI
<br /> _ *
<br /> CONTRACTOR
<br /> R TO R NNEC ALL E
<br /> 0 E CO EXISTING ELECTRICAL CONDUITS AS REQUIRED. ys
<br /> TOR TO INSTALL NEW VEEDER ROOT ISD PRESSURE SEN
<br /> O
<br /> TANKS. 1 SENSOR AT DISPENSER NEAREST THE
<br /> NEW ISD PRESSURE 4 G ENG1N�
<br /> SENSOR
<br /> !EXISTING
<br /> 7 INSTALL NEW BOLLARD __.___ A
<br /> �� �� - CRETE p LL VERTICAL NEW CLEAN AIR SEPARATOR UNIT ON 4 0X4 0X8 MINIMUM K
<br /> N
<br /> „.,..,,,,,,,. I CON AD. THTC
<br /> CONTRACT
<br /> (TYP. 6 PLCS.)
<br /> STORAGE f ::
<br /> ONTAIN O LY K 251-6222
<br /> 032
<br /> EC 1” VENT LI
<br /> "LAND PLANNING AND DESIGN
<br /> SEE INSTALL NEW HEALY CLEAN AIR ""` REMOVE AND REPLACE TANKRTOVVENTOSTACKFMANIFOLDEPERI DETAISOLS 0 EE 1/8" PER FOOT FROM NEW HEALYCLEANAIRS
<br /> clAusTs
<br /> .18215 72ND AVENUE SOUTH
<br /> 5 SEPARATOR TANK ON 4'x4'x8" SEPARATOR. CONTRACTOR TO VERIFY THAT EXISTING TANK VENTS ARE A MINIM ( )
<br /> 8
<br /> TK2-1 ............_W,,;:,_ EXISTING MONITORING UM OF 12' ABOVE GRADE
<br /> ENT, WASHINGTON 98
<br /> 425
<br /> CONCRETE PAD W/ BOLLARDS CONSOLE 9 ? AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. INSTALL
<br /> HEALY CLEAN AIR SEPARATOR TANK AND ASSOCIATED PIPING AND FITTINGS PER NEW CARB EVR P
<br /> 6 (E) (3) 2" VENT RISERS it
<br /> SEE DRAWING ELATION SHALL BE PER CAR 0 AND MANUFACTURERS INSTRUCTIONS
<br /> _ PHASE II
<br /> NO DA
<br /> WING TK2-1 FOR DETAILS.
<br /> W I
<br /> STANDARDS AND
<br /> E.O. VR 2
<br /> TE REVISION
<br /> DESCRIPTION
<br /> 02. INSTALLATION
<br /> m..
<br /> B E
<br /> —_..
<br /> NOTE: INSTALLATION SHALL MEET THE STATE APPROVED INSTALLATION INSTRUCTIONS FOR THE HEALY
<br /> 1 7/21/08 PERMIT RELEASE
<br /> i z
<br /> ........,,.
<br /> SYSTEMS INCORPORATED CLEAN AIR SEPARATOR AND THE STATE APPROVED IN-STATE DIAGNOSTICS s
<br /> Lv INSTALLATION INSTRUCTIONS.
<br /> 3 ,
<br /> 7; <
<br /> . . e . ....... ......
<br /> Q I Ifl \ \\ - O W CONCRETE FILLED BOLLARDS IN LOCATIONS SHOWN. CONTRACTOR TO FIELD a
<br /> "' W CONTRACTOR TO INSTALL NEW€„1 _I VERIFY THAT NEW BOLLARD LOCATIONS DO NOT COMPROMISE EXISTING UNDERGROUND PIPING OR UTILITIES.
<br /> _ ARCO FACILITY #21 8 6 ` 00 Z FIELD ADJUST LOCATIONS AS REQUIRED TO AVOID ANY UNDERGROUND OBSTRUCTIONS.
<br /> 4 r
<br /> Z i i II ;% a �-� „
<br /> t
<br /> CONTRACTOR TO REMOVE EXISTNG VEEDER ROOT MONITORING PANEL AND INSTALL NEW VEEDER ROOT
<br /> z PLANTER of` �. I w Q O (TLS OR) PANEL AT THE EXISTING LOCATION. RE-LAND SENSOR WIRING IN NEW PANEL PER DETAILS &
<br /> _ 35
<br /> J =I „ n,E.. z PROGRAM TO PANEL MONITOR TANK SUMPS, DISPENSER SUMPS, TANK LEVEL PROVE, ISD FLOW METER, S
<br /> a. y �'� A ( ��I w 8
<br /> Q v �l, f ;. j ,,,,,,,,,,r,T Q PRESSURE SENSOR & TANK ANNULAR SPACES.
<br /> �.
<br /> I I � D
<br /> a yv �••• � O VEEDER ROOT PANEL TO BE PROGRAMMED BY A CERTIFIED TECHNICIAN UPON COMPLETION OF UPGRADE
<br /> D
<br /> SERVICE.
<br /> -. _,_..... ,._. _.- ” " ....._,,. �. ....._.,, -t ! � i � i; AND PRIOR TO PLACING EQUIPMENT BACK IN
<br /> ;^
<br /> I 9
<br /> a i -' -.._.._--.... . ,,.,, _...,.._, ,..,,,_,. ......... .. ......._ .. .... ,.._._ a 0 10 WHERE EXISTING TURBINES SEkVE IN A MASTER AND SLAVE CONFIGURATION, CONTRACTOR TO REWIRE SUCH z
<br /> I
<br /> 3
<br /> ' THAT THE VEEDER ROOT AUTOMATIC TANK GAUGE DETERMINES WHICH TURBINE IS STARTED AS THE MASTER SEALOFESSIp
<br /> it i
<br /> it
<br /> .. ...
<br /> BASED ON THE LEVEL OF PRODUCT IN THE TANKS. SEE DRAWING TK3-2 FOR DETAILS QR N4(
<br /> ... ... . .... . .... .. ........
<br /> - - - _ ..................
<br /> CON1TRA
<br /> t it ,_ ( HORITY FORWARD RESULTS TO OWNER AND TO JURISDICTION A
<br /> ARB E 0 VR 202 E AND LOCAL
<br /> it
<br /> SEE 3 IN THE PERMIT CONDITIONS. S SPECIFIED J G4
<br /> CTOR TO PERFORM ALL REQUIRED VAPOR RECOVERY TESTING PER C
<br /> i it
<br /> AIR EPOLLUTION CONTROL AUT AND HA B
<br /> it it
<br /> it
<br /> /it
<br /> ! �4 m
<br /> TK2-1 EXISTING AIR WATER UNIT
<br /> it
<br /> it
<br /> XIS BARC 7 IN E ! O RETRO—FIT TO
<br /> EHOSEGPERLSIDEOBLENDING 3E TRASH ENCLOSURE l tT Q
<br /> NO NEW ELECTRICA LOA+OS ARE BEING NTRODUCED AS A RE ULT OF THIS PR JECT. CONTR CTO
<br /> CONFORMANCEENSURE THAT AANDLL NMEETTS EW HEREQUI EMEN REQUIREMENTS CDECO2 07ESECTIONG5114 AS SPECIFIEDDISPENSERS LINBTHENPERMIT C/30
<br /> it L
<br /> \,,' PRODUCT MPD'S TO REMAIN. /Q9
<br /> \\ CONVERT DISPENSERS VAPOR CONDITIONS. �q7 V 1 ��\
<br /> OF CA�FFO
<br /> } RECOVERY SYSTEM TO HEALY EVR 13 CONTRACTOR TO FIELD VERIFY THE INSTALLATION OF (1) FIRE EXTINGUISHER MINIMUM RATED 2-1 20BC CONFIDENTIALITY STATEMENT-.
<br /> tt PHASE II WITH ISD tt
<br /> WITHIN LOCATION OF 75' TO 20' OF THE TANKS. ME RECIPIENT
<br /> OF HESE MATERIALS UNDERSTANDS MAT
<br /> (TYP. OF 4)
<br /> COPYRIGHT IN ME MATERIALS IS OWNED BY BP, AND ALSO,
<br /> t!( I `� THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL
<br /> `\ ....... .. 3 BU9NENT IAGREES TON OF IN ACCORDINGLY, THE
<br /> IN
<br /> RECIPIENT AGREES r0 RETAIN THESE MATERIALS IN STRICT
<br /> CONFIDENCE AND AGREES NOT TO AND
<br /> FURTHER
<br /> THESE
<br /> MATERIALS TO ANY OTHER PARTY ANO FURTHER AGREES
<br /> ? t \_„ „ ;• (/\_ [/�_ /!''�� NOT To MAKE COPIES OF THE MATERIALS. THE RECIPIENT I
<br /> ...::::........ ..... ......._ COMPLIANCE NOTES AGREES TO USE THE MATERIALS ONLY FOR ME LIMITED
<br /> ` �. ...._'.... .••� ---------------------........ ,._.. __,,,,.. ----.........._ - � PURPOSE FOR WHICH SP HAS MADE THE MATERIALS I
<br /> a 3 AVAILABLE. AND RECIPIENT AGREES TO RETURN ALL
<br /> ' ......._. rte,. _............ .................. .... 't\ l I ,iINTENDED
<br /> N END DSPURPOSETO BP E OR UPON ITHER OTHE OREQUEST N OFF BP•E
<br /> / """' """" "" - --- ,�\ ,_,, 1. ALL DIIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING
<br /> , -.,_ :' WH HII S FIRST. v
<br /> _ — fI....... ......... ......_.__......_..__...... -.... Y WORK. SHALL BE CALLED TO THE ATTENTION OF PIP AND TANK DESIGN DISCLAIMER-
<br /> PETROLEUM
<br /> e w. x
<br /> _ AN K ANY DISCREPANCY THE OWNERS ENGINEER FORDIS IM
<br /> PROPERTY LINE •,
<br /> _19-5=� HIS DECISION BEFORE PROCEEDING WITH THE WORK. BE DOES NOT AND CANNOT WARRANT THAr ME PLANS FOR Z
<br /> PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH
<br /> ALL LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE Q
<br /> 2. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR APPLIED IN HE FUTURE. NOR Does BE WARRANT HAT a
<br /> FUELING STORAGE AND DELIVERY SYSTEM CONSTRUCTED IN
<br /> i
<br /> EXCAVATIONS OF TRENCHES 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO LEAKS
<br /> CONFORMITY
<br /> RE ACCORDINGLY STRONGLY ENCS OF
<br /> O 4
<br /> \ i ,A I
<br /> DESGEIIVD CONSULT WTH A FUELING STATION ENGINEER OF YOUR T DO
<br /> J CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE
<br /> \ \ "•, i : - PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTNG ME
<br /> .........._...: l• ? J 'F STORAGE AND DELIVERY SYSTEM AT YOUR STATION. %
<br /> . .........................._ ..... ... ..._..._ ..... ..._....... ._. ....... i
<br /> .,..... _........ _.__. _..___ ........_...._ 3• D PURPOSE AS PER NATIONALLY DEVELOPMENT INFORMATION
<br /> - ,.• ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED NATIO DE : II
<br /> ""'
<br /> RECOGNIZED CO CAL CODES AND GOVERNING DES, LO ERNING AUTHORITIES.
<br /> UNDERGROUND STORAGE
<br /> 4. FUELING SYSTEM TO BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS TANK STANDARDS
<br /> REPRESENTATIVE PRIOR TO BEING PLACE BACK IN SERVICE.
<br /> EVR PHASE II WITH ISD °
<br /> 5. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED V-8,02008 SERIES 12
<br /> DO
<br /> N . CALIFORNIA STREET BY GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION (AS APPLICABLE). o
<br /> CALIFORNIA MARKET
<br /> 6. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING N
<br /> ANNULAR SPACES OF TANK. sTE ADDRESS:
<br /> 7. REFERENCED CODES SHALL INCLUDE 2007 CBC; 2007 CFC, ARTICLE 79; 2007 CEC; 2007 CMC. $212 NORTH CALIFORNIA
<br /> 8. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2007 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL STOCKTON, CA
<br /> BE PROVIDED. THE AUTOMATIC FIRE SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES.
<br /> UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT. m
<br /> 0
<br /> FACILJTY No.2166
<br /> DRAWING INDEX DESIGNED BY: ALLIANCE zaDM: F
<br /> OHMIED BY: OV BP REPM:
<br /> TK1-1 EVR PHASE II AND ISD UPGRADE SITE PLAN DRAVIN BY: �P AWANCE PM: a
<br /> TK2-1 DISPENSER EVR PHASE II HANGING HARDWARE & ISD VERSION: PROJECT No 0
<br /> SENSORS, INSTALLATION AND EQUIPMENT V-8.0 BCE#13436
<br /> * TK3-1 NEW VEEDER-ROOT PANEL MONITORING WIRING DETAILS (EVR
<br /> �(7�Y '� ,l PHASE II RETROFIT PROGRAM) DRAVANG TITLE _
<br /> EVR PHASE II AND ISD UPGRADE SITE PLAN TK3-2 ELECTRICAL FUELING WIRING DETAILS FOR VEEDER-ROOT &
<br /> TYPICAL TURBINE SET-UP EVR PHASE II RETROFIT PROGRAM EVR PHASE II AND ISD o
<br /> ( ) UPGRADE SITE PLAN
<br /> SCALE: 1"=10'-0"
<br /> DRAWING DISCLAIMER NOTE AOMD INFORMAMN Y
<br /> THIS SITE PLAN HAS BEEN PREPARED WITHOUT BENEFIT OF TITLE REPORT, N0. FUELING POSITIONS: 8 SHEET N0
<br /> 1 00120 Call Toll Free SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS DOES NO. GASOLINE NOZZLES: 8
<br /> 1 (888) 258-0808 NOT WARRANT THE ACTUAL LOCATION OF PROPERTY LINES AND SETBACKS. IT IS NO. DIES I 0
<br /> TWO THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO VERIFY PROPERTYWORKIN �T,`II_',\ JLC (� E
<br /> BEFORE DAYS LINES AND SETBACK DISTANCES WHERE THEY MAY AFFECT THE PLACEMENT OF TK1
<br /> M
<br /> BEFODIG
<br /> RE YOU NEW EQUIPMENT AS A PART OF THIS PROJECT, THE DRAWING REFLECTS n a
<br /> EXISTING SITE CONDITIONS AS PROVIDED BY BP FROM ARCHIVE RECORDS. AUG 2 d 2008 H
<br /> ENVIROWIEN I HEALTFI
<br /> PERMIT/SERVICES
<br /> Ii
<br /> w
<br />
|