Laserfiche WebLink
CLIENT: <br /> � 4'-0 O <br /> 1" GALVANIZED VENT PIPING MIN. SLOPE BOLLARD (TTP.) <br /> TO VENTS 1/8" PER FOOT, 10OFT. MAX 4'-0 <br /> PRESSURE VACUUM LENGTH. MAX. DISTANCE WITHOUT PIPE 1 -O /16" <br /> VENT CAPS (SEE NOTE FLOAT CHECK VALVE SUPPORT NOT TO EXCEED 10', <br /> BELOW) P/N 9468G DISTANCES OVER 10' REQUIRE PRIOR (TYP.) <br /> OVERFILL PROTECTION APPROVAL OF BP DESIGN MANAGER. SAME ELEV. AS _ _ _ _ _ ARCO <br /> TOP OF P V VALVE CO _ — — — <br /> a ,„bP WESTCOASEPIIODUCfS,LLC <br /> 2" AIR BREATHER ASSEMBLY <br /> GALVANIZED P/N 9948 12' MINIMUM v o 4 NEW FUEL HOSE WHIP <br /> UNION & 2"X1" REDUCER BUSHING SIPHON VAPOR <br /> ABOVE GRADE -- I AWANCE MANAGER, AGENT FOR BP: <br /> NIPPLES VAPOR INLET ASSM. / N 5 NEW FUEL HOSE BREAKAWAY <br /> P/N 9956 (REF.) / <br /> 2" GALVANIZED ELBOW --- --- CD / <br /> 2" TEE W PLUG <br /> GALVANIZED / O --------i-------- <br /> TEE <br /> — — O <br /> 2" SCH. 40 STEEL VENT SIPHON TUBE ADAPTER 12 EXISTING DISPENSER <br /> RISERS TO REMAIN - - - P/N 9939 (REF.) <br /> BALL VALVE 30" D A. <br /> o BASE o <br /> I <br /> LOCKED OPEN HEALY CLEAN AIR n O <br /> �OR Is ;' SEPARATOR KIT INCLUDES 11/16 <br /> IN NORMAL CLEAN AIR SEPARATOR 4 HOLES ON o 0 0 0 <br /> OPERATION % ` TANK, BALL VALVES, FLOAT 32" DIA. B.C. <br /> CHECK REDUCER BUSHINGS <br /> BALL VALVE 996123 I ; AND ALL ACCESSORIES „ NATIONAL SITE ADAPT CONSULTANT: <br /> 99 <br /> LOCK P/N 996124 i SHOWN EXCEPT 1" PIPING. O 2 -0 2 -0 1 NEW NOZZLE (TYP.) <br /> -� USE KEY P/N 996125 I <br /> VAPOR I HEALY CLEAN AIR �G H q US <br /> ¢F BALL VALVE \ / SEPARATOR <br /> I 2 NEW NOZZLE SWIVEL <br /> 36" O.D. X 93" L.G. <br /> =Z ; ( ) <br /> LOCKED OPEN <br /> ww <br /> 'o P/N 9961 3 NEW FUEL HOSE <br /> a ¢z �] OR [� 1 3< PLAN VIEW <br /> W_M (OPERATION 1 1 704 PLACARD O ys �Y 1. y? <br /> w2~ BALL VALVE P/N 996123 T Ez G <br /> LOCK P/N 996124 %/ :` AIR o �r'Nc ENG1N�� <br /> owoo USE KEY P/N 9961252206.7.9.2.2 LOCATION "LAND PUNNING AND DESIGN SPECIALISTS" <br /> . SIPHON TUBE <br /> P/N 4186-6 (REF.) <br /> �V)o % ` VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED AT OR 18215 72ND AVENUE SOUTH <br /> SwF BALL VALVE <br /> ABOVE GRADE. SOURCES OF IGNITION SHALL BE LOCATED NOT KENT, WASHINGTON 98032 <br /> ?c:l> LOCKED OPEN " 400 GALLON BLADDER, <br /> LESS THAN 50 FEET 15240mm FROM FUEL-TRANSFER (425) 251-6222 <br /> o� P/N 9943 (REF.) <br /> NwlOR AREAS AND NOT LESS THAN 18 INCHES (457.2mm) ABOVE Jk <br /> i 'v TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS. <br /> BOLLARD (TYP.) <br /> LULU IN NORMAL i VAPOR-PROCESSING UNITS SHALL BE LOCATED NOT LESS NO. DATE REVISION DESCRIPTION <br /> =x OPERATION <br /> w ; THAN 10 FEET (3048mm) FROM THE NEAREST BUILDING OR /zI/oB PERMIT RELEASE <br /> BALL VALVE P/N 996123 I 77 <br /> LOCK P/N 996124 I PROPERTY LINE OF A PROPERTY WHICH CAN BE BUILT UPON. <br /> / 1 i <br /> FRONT OF EXCEPTION: WHERE THE REQUIRED DISTANCES TO EXISTING (3+0) DISPENSER WITH NEW EVR PHASE II HANGING HARDWARE 2 <br /> USE KEY P/N 996125 ; BOLLARD NOT SHOWN BUILDINGS, PROPERTY LINES OR FUEL-TRANSFER AREAS SCALE: NTS <br /> IN THIS VIEW FOR CANNOT BE OBTAINED, MEANS SHALL BE PROVIDED TO a <br /> u ; CLARITY. SEE PLAN PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLE a <br /> I <br /> PLUG VIEW BELOW f MEANS INCLUDE: s <br /> (*SEE BELOW) �`�\ ;' 1" CONDENS TE DRAIN 1. APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT NEW EQUIPMENT SOLUTION FOR EVR PHASE II LISTED AREAS CALIFORNIA (PER VR-202) <br /> LEASE 18 INCHES (457.2mm) ABOVE THE EQUIPMENT, ITEM BY DESCRIPTION QTY MANUFACTURER c <br /> CONSTRUCTED OF FIRE-RESISTANT OR NON-COMBUSTIBLE <br /> 8" FIBER REINFORCED MATERIALS OR 1 BP VAC. ASSIST DISPENSER W/ HOLD OPEN CLIP. 8 "HEALY" MODEL NO. HE-900 <br /> 23" CLEAR <br /> CONCRETE TANK SLAB SYSTEM.2. RE PROTECTION USING AN APPROVED WATER-SPRAY O B <br /> BUCKET AT <br /> dCLEAN <br /> V BP SWIVEL 8 INTEGRAL TO WHIP HOSE e <br /> TYPICAL SPILL ° ° _ ° o <br /> HIGHEST ELEVATION / / / n - ° , VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED A D <br /> *MAINTAIN CLEARANCE—' • • ° ° . . HEALY CLEANOAIR SEPARATOR MINIMUM OF 20 FEET (6096mm) FROM DISPENSING DEVICES. O3 BP INVERTED COAXIAL HOSE: — 8'-6" 8 "HEALY" MODEL NO. HE-75BO85S2S2 <br /> IN A DIRECT LINE TO TANK TO BE LOCATED IN PROCESSING EQUIPMENT SHALL BE PROTECTED AGAINST I <br /> \/\\/\\/\\/\\/\ ALLOW FOR CONNECTION SU6BASE CONFORMANCE WITH PHYSICAL DAMAGE BY GUARDRAILS, CURBS, PROTECTIVE _ _ <br /> \\/\\�/ / OF TESEENEXH BAT 4T OF •' ° a° `° ° MANUFACTURERS INSTALLATION ENCLOSURES OR FENCING. WHEN APPROVED PROTECTIVE ® B z <br /> P INVERTED COAXIAL WHIP HOSE 1' O" 8 "HEALY" MODEL NO. HE-75B010S4F2 <br /> ° ° MANUAL, CARB EXECUTIVE ENCLOSURES ARE USED, APPROVED MEANS SHALL BE SEAL• �FESSIp <br /> LATEST VR-202 E.O. s s a n ° a a ORDER VR-202 AND ALL PROVIDED TO VENTILATE THE VOLUME WITHIN THE ENCLOSURE 5 BP COAXIAL BREAKAWAY COUPLING — DUAL POPPETED 8 "HEALY" MODEL N0. HE-8071—W QR Hq� <br /> / // // o, U,B R E / / / APPLICABLE STATE AND LOCAL O <br /> /.� /��R /\/ // // // CODES. PER CFC 2007 TO PREVENT POCKETING OF FLAMMABLE VAPORS. O <br /> , SECTION 2206.7.9.2.2 & © BP HEALY HARDWARE KIT - Z078H, HEALY ELECTRICAL KIT - Z078E 4 "HEALY" MODEL N0. HE-VP1000(X) (KIT) <br /> 2206.7.9.2.3 IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE �_ <br /> //\ \/\\� VAPOR-PROCESSING UNIT FROM A FUEL-TRANSFER AREA, THE CLEAN AIR SEPARATOR TTANK AND INSTALLATION KIT - INCLUDES (UNIVERSAL KIT) (1 PER EACH DISPENSER) L,P. GRUBB r+ xNOTE: ` <br /> FRONT ELEVATION /\\ °e °a ' ADDITIONAL SCREEN WALL OR CHIEF IS AUTHORIZED TO REQUIRE ADDITIONAL SEPARATION BY OO BP BALL VALVES, FLOAT CHECK, REDUCER BUSHINGS AND ACCESSORIES 1 "HEALY" MODEL NO. HE-9961 (1 PER SITE) 67814�1 z <br /> CONSTRUCTION MAY BE DISTANCE AND HEIGHT. O �1I = <br /> REQUIRED . LOCAL ® BP VAPOR FLOW METER FOR ISD 4 "VEEDER—ROOT" MODEL N0. 331847-002 (1 PER SITE) 6/30/49 a <br /> ORDINANCES. MINIMUM 2206.7.9.2.3 INSTALLATION Q <br /> MOUNTING REQUIREMENTS ARE VAPOR—PROCESSING UNITS SHALL BE SECURELY MOUNTED ON �4T p V I V ��� <br /> SHOWN IN THIS DETAIL. PER O9 BP VAPOR PRESSURE SENSOR FOR ISD 1 VEEDER—ROOT" MODEL N0. 331847-001 1 PER SITE F EO <br /> CFC 2007 SECTION CONCRETE, MASONRY OR STRUCTURAL STEEL SUPPORTS ON ( ) OF <br /> 2206.7.9.2.2 CONCRETE OR OTHER NON—COMBUSTIBLE FOUNDATIONS. <br /> 10 BP 4" DIA. SCH. 40 TRAFFIC; BOLLARD 4 "RIVERSIDE STEEL" OR EQUAL BP TRAFFIC BOLLARD 0NFID NTIA ITT STATEMENT: <br /> TANK VENT RISER WITH VERTICAL HEALY CLEAN AIR SEPARATOR VAPOR—RECOVERY AND VAPOR—PROCESSING EQUIPMENT IS THE RECIPIENT OF THESE MATERIALS UNDERSTANDS,HAT <br /> CDPYRIGHT IN THE MATERIALS IS OWNED BY BP• AND ALSO, <br /> THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTAL <br /> SCALE: 3/4" = l'—O" ALLOWED TO BE INSTALLED ON ROOFS WHEN APPROVED. <br /> 11 BP TLS-350 PLUS ENVIRONIMENTAL & INVENTORY MANAGEMENT SYSTEM 1 "VEDEER—ROOT" 84890-022 (1 PER SITE) BUSINESS INFORMATON OF DP, ACCORDINGLY. THE 6 <br /> RECIPIENT AGREES TO RETAIN THESE MATERIALS IN STRICT 0 <br /> CONFIDENCE AND AGREES NOT TO DISCLOSE THESE 0 <br /> MATERIALS TO ANY OFFER PARTY AND FUELLED AGREES (n <br /> NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT <br /> 12 BP EXISTING DISPENSERS 4 (4) "GILBARCO" B78 AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> PURPOSE FOR WHICH BP HAS MADE THEMATERIALS <br /> AVAILABLE, AND RECIPIENT AGREES TO RETURN ALL <br /> MATERIALS TO BP EITHER UPON COMPLETION OF THE d <br /> INTENDED PURPOSE OR UPON THE REQUEST OF BP, <br /> WHICHEVER COMES FIRST. Do <br /> PIPE AND TANK DESIGN DIS AIM R, <br /> NEW 4" DIAMETER STANDARD If) <br /> PIPE, FILL WITH CONCRETE, PETROLEUM°STORRAGEAAND DISPENSING ARE COMPLIANTS WITH 00 <br /> ALL LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE <br /> APPLIED IN THE FUTURE. NOR DOES BP WARRANT AT A 0 <br /> MOUND ON TOP & WITH 6 THAT <br /> STORAGE AND DELIVERY SYSTEM CONSTRUCTED IN N <br /> CONFORMITY WITH TIESE PLANS WILL BE FREE OF ALL <br /> REFLECTIVE TAPE 1 D PUMP MOUNTING PLATE OR LEAKS. YOU ARE ACCORDINGLY STRONGLY ENCOURAGED TO <br /> ''// HEALY PUMP 6 CONSULT WITH A FUELING STATION ENGINEER OF YOUR <br /> /Z" ELASTOMETRIC EXPANSION BRACKET CHOOSING To INDEPENDENTLY EVALUATE WHETHER THESE N <br /> PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> MATERIAL AT PERIMETERSTORAGE AND DELIVERY SYSTEM AT YOUR STATION. rl <br /> DISPENSER SKIN FLANGE W/ 1" NPT THREADED DEVELOPMENT INFORMATION: <br /> CD INLET E <br /> PAVEMENT OR GRADE - SEE NOTE: IF THERE IS NO ROOM TO 1/2" THREADED PIPECABLE TO JUNCTION BOX UNDERGROUND STORAGE <br /> SITE PLAN INSTALL THE VAPOR FLOW METER <br /> ABOVE THE SHEAR VALVE, IT IS L1� TANK STANDARDS o <br /> ACCEPTABLE TO INSTALL FLOW METER = 9 VAPOR PRESSURE SENSOR 1/2" UNION MOUNT SENSOR TO EVR PHASE II WITH ISD 3 <br /> 2500 PSI AIR ENTRAINED BELOW SHEAR VALVE PER E.O. <br /> (ONLY 1 PER SITE) <br /> CONCRETE FOOTING VR-202. SEE MOST RECENT VEEDER DISPENSERS INNER V-8.02008SERIES <br /> 1/2" x 1" THREADED MALE ADAPTOR -° <br /> ROOT INSTALLATION INSTRUCTIONS FOR FRAME WITH SUPPLIED <br /> ISD FLOW METERS B VAPOR FLOW SENSOR INLET SCREEN BRACKET CALIFORNIA MARKET Y <br /> 1 4" OD COPPER TUBING. o <br /> SITE ADDRESS: <br /> � ���"�� NEW VAPOR FLOW SENSOR 8 / � <br /> — EXISTING DISPENSER FRAME � � AVOID ANY TRAPS! (BY 3212 NORTH CALIFORNIA <br /> a _ IT 1" SHORT NIPPLE— <br /> STABILIZER <br /> IPPLE �. CONTRACTOR) .STOCKTON� <br /> III VIII n I� �I n IT1777-7777 <br /> III EXISTING FLEX CONNECTOR VAPOR SHEAR VALVE STABILIZER ASSEMBLY CAP CA j <br /> _ o OUTLET 0-RING 2-WAY CALIBRATION VALVE o <br /> III —III III—III—III o ' " ° " g FLANGE W/ 1" FACILITY N0.2186 <br /> III= <br /> I1_1 I Fa II II =III III ° U NPT THREADED <br /> CDOUTLET DESIGNED BY:III tt I AWANCE ZAD — <br /> I II II—III VIII QII Ik III III III I ,ppy M w <br /> _ _ IEXISTING VAPOR aEa�D Br OV W REPM: u: <br /> ILII III a II II III—III—I EXISTING VAPOR LINE REDUCE THREADS FROM 1-1/2" TO = <br /> as �I II —III—III— 1/4" WITH DOUBLE TAP BUSHING(S). SHEAR VALVE DRAWN BY: ip AwANCE PM: a_ <br /> III= VII n III=III—III APPLY APPROVED PIPE DOPE AT ALL VERSION: PRO&CT NO: 00 <br /> 0 <br /> EXISTING PRODUCT LINE EXISTING UNDER DISPENSER THREADS FOR A TIGHT SEAL. V�8'0 BCE #1 0 <br /> _ _ _ CONTAINMENT SUMP VAPOR RETURN <br /> DRAWING TITLE: <br /> III—III—III ° n� . —III—III BACK TO TANKS DOPEM EM PHM N o <br /> III=III—III °n —III=III _ p _ EXISTING SUMP SENSOR IN NANMMMAMAM <br /> HOLDER I u <br /> III—III=III —IIEQUMW s <br /> 1 '-6' NOTES: <br /> ONLY (1) VAPOR PRESSURE SENSING DEVICE REQUIRED PER SITE. SENSOR SHALL BE MOUNTED SHEET NO: E <br /> AT ONLY (1) DISPENSER LOCATED CLOSEST TO TANKS. m <br /> NOTE: CONCRETE FOUNDATIONS ARE MINIMUM REQUIREMENTS. <br /> LOCAL BUILDING CODES OR FROST LINE MAY REQUIRE CONTRACTOR SHALL PITCH ALL 1/4" TUBING AS REQUIRED TO AVOID ANY LIQUID TRAPS j <br /> GREATER DEPTH. TlQwl <br /> 0ISD PRESSURE & VAPOR FLOW METER AT EXISTING DISPENSER DETAIL0 <br /> BUMPER POST DETAIL ISD VAPOR FLOW METER & PRESSURE SENSOR DETAIL 0 <br /> SCALE: NTS SCALE: NTS <br /> SCALE: NTS <br /> i <br /> w <br /> i� <br />