My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 4:35:27 PM
Creation date
3/28/2019 8:40:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> GETTLER-RYA N INC. GR Job# 20-582062.1 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 329.00 <br /> Complete the following checklist: <br /> Yes ❑ o Is the audible alarm operational? <br /> Yes ❑ No' Is the visual alarm operational? <br /> Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> ro er o eratJ n? <br /> ❑ Yes ❑ No' if alarms are relayed to a remote monitoring station,is all communication equipment(e.g.modem)operational? <br /> WA <br /> Yes ❑ No' For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ WA detects a leak,fails to operate,or is electrically disconnected?ff yes:which sensors initiate positive shut-down?(Check all that apply) <br /> rX Sumprrrench Sensor; ra Dispenser Containment Sensor.Did you confirm positive shut-down due to leaks gad sensor <br /> failure/disconnection? Yes; ❑ No. <br /> Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill prevention <br /> ❑ NIA valve is installed),is the overfill warning alarm visible and audible at the tank fill points)and operating property?If so,at what percent <br /> of tank capacity does the alarm trigger? ---!0--% <br /> Yes ❑ No Was any monitoring equipment replaced?if yes,identify specfic sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E.below. <br /> Q Yes No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) []Product; []Water. If <br /> yes,describe causes in Section E,below. <br /> Yes ❑ No' Was monitoring system set-up reviewed to insure proper settings?Attach set-up reports,if applicable. <br /> Yes ❑ No' I Is all monitoring equipment operational per manufacture's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 4 12/07 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.