Laserfiche WebLink
SWRCB,January 2002 Page_3_of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ® Pressure ❑Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used:0—15 PSI GAUGES Equipment Resolution: +/-0.002" <br /> Piping Run#87(1) Piping Run#87(2) Piping Run#91 Piping Run# <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: A.O.SMITH A.O.SMITH A.O.SMITH <br /> Piping Diameter: 2"X 3" 2"X 3" 2"X 3" <br /> Length of Piping Run: 150' 25' 150' <br /> Product Stored: 87 87 91 <br /> Method and location of TEST BOOT/ TEST BOOT/ TEST BOOT I <br /> piping-run isolation: STP SUMP STP SUMP STP SUMP <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MIN 10 MIN 10 MIN <br /> starting test: <br /> Test Start Time: 10 MIN 10 MIN 10 MIN <br /> Initial Reading(RI): 10:00 AM 10:00 AM 10:00 AM <br /> Test End Time: 5.0 PSI 5.0 PSI 5.0 PSI <br /> Final Reading(RF): 11:00 AM 11:00 AM 11:00 AM <br /> Test Duration: 1 H R 1 H R I H R <br /> Change in Reading(RF-Rj): 0 0 0 <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ®Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />