My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 1:14:19 PM
Creation date
3/28/2019 10:48:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2017
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UtrrtfR-11YAN INC. GR Job # /7200007 <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Bo", <br /> Complete the following checklist: E <br /> I VE D <br /> E es ❑ o Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> a Yes ❑ No" Were all tank gauging probes visually inspected for damage and residue buildup? <br /> E Yes ❑ No' Was accuracy of system products level readings tested? <br /> E Yes ❑ No' Was accuracy of system water level readings tested? <br /> E Yes ❑ No' Were all probes reinstalled properly? V IFIGNMENi A _/�Ll-u <br /> � Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? f� <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> [y es ❑ o' or egwpmen s a -up or a n 57-57 equrpmen ce i ica ion.was a ea simu a ed to veritype ormance c ec a <br /> ❑ N/A that apply) Simulated leak rate: ja 3 g.p.h. ❑ 0.1 g.p h. ❑ 0.2 g.p.h. <br /> Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No' For Mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> E Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ N/A Disconnected? <br /> E Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> ❑ N/A fails a test? <br /> E Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> E Yes ❑ No' were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Comments: <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> -i <br />
The URL can be used to link to this page
Your browser does not support the video tag.