My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0232437
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 9:31:45 AM
Creation date
3/29/2019 9:20:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0232437
PE
2361
FACILITY_ID
FA0003787
FACILITY_NAME
SHERIFFS OPERATIONS CTR #1
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery Fill Riser - <br /> 31 <br /> r <br /> OPW <br /> x <br /> Ball Float <br /> 14" Minimum – <br /> Clearance for <br /> Tube Cut Float 4 " NPT <br /> per Loca I <br /> Requirements Nipple <br /> a <br /> 6" <br /> �— Align Float Along Length of Tank Swivel <br /> Figure 24 <br /> Product Jack <br /> Adaptor Screw <br /> Kit <br /> Orient socket <br /> adaptor be - FOR TESTABLE MODELS ONLY : Check installation <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screw bolts resets properly . See page 17 for full testing details . Ap - <br /> ply pipe dope to the socket adaptor threads . Pipe dope <br /> should be a non - hardening gasoline resistant pipe <br /> thread seal compound . Install socket adaptor and <br /> 0 torque to 3 . 5 ft- lbs (42 in - lbs) minimum to 5 . 0 ft- lbs ( 60 <br /> in - lbs) maximum . After installing socket adaptor where <br /> required , pressure test testable overfill valve per CARB <br /> TP201 . 1 D to ensure valve is vapor tight . <br /> Figure 24A <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.