My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
2900 - Site Mitigation Program
>
PR0538728
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 2:31:25 PM
Creation date
4/1/2019 10:01:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538728
PE
2950
FACILITY_ID
FA0022234
FACILITY_NAME
ZACKY & SONS POULTRY LLC
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
01
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/14/1995 04:52 9093579307 TONTO PAGE 05 <br /> • • SOP NO. 10.2 <br /> REVISION NO.0 <br /> DATE: Mnfi 95 <br /> PAGE 4 OF r l <br /> work pians and SOPS, generation of variances to CPT and sampling requirements, issuing <br /> nonconfaamances, eon.) if problems occur. <br /> 4.1.3 Field personnel assigned to CPT, soil sampling, and Hydtopunch® activities are <br /> ' responsible for completing their tasks according to this and other appropriate procedures. All <br /> staff are responsible for rep x g deviations from the procedure to the Site Superintendent, <br /> Delivery Order Manager, or the C QCM. <br /> ' 4.2 Prep wafka Procedure <br /> ' 4.2.1 prior to commencement of CRT activities, elrame that all CRT, soil sampling, and <br /> HydropumchO locations have been appropriately cleared of all undergtonnd utilities and <br /> buried objects per the project work plans. Review all forms and diagrams documenting the <br /> location of the cleated sampling and CPT locatiou, as well as that of any underground utility <br /> lines or other buried objects. <br /> 4.2.2 Performa calibration of air monitoring g equtiptaent tequh+ed for air spar <br /> ' monitoring according to the instrument manufamaer's specifications. Calibration results will <br /> be recorded on the appropriate form(s). as specified in the project work plans. Instruments <br /> that an not be calibrated according w the manufactu='s specifications will be removed from <br /> service and tagged <br /> 4.2.3 Don the appropriate personal protection equipment specified in the project-specific <br /> work plans. <br /> 4.1 Coni P*wtf>ftfon T"Mg <br /> ' In general. the CPT is the first run to be conducted. Tire CRT rig is normally truck-mounted <br /> and contains a hydraulic push system (20 ton is typical). The depth of investigation will <br /> ' <br /> typically be less than 100 feet below ground surface (bgs). Lighter weight rigs an be <br /> utilized for shallow surveys up to Approximately 15 feet bgs. <br /> ' Some CRT rigs are equipped with an au ornatic decontamination system feaaaing an enclosed <br /> chamber that may be mounted beneath the CPT rig (project-specific decontamination <br /> M7j03.1 t:93MVT/SOP/10P10.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.