My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
2900 - Site Mitigation Program
>
PR0538728
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 2:31:25 PM
Creation date
4/1/2019 10:01:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538728
PE
2950
FACILITY_ID
FA0022234
FACILITY_NAME
ZACKY & SONS POULTRY LLC
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
01
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/14/1995 04:52 9093579307 TONTO <br /> ' • PAGE 05 <br /> • SOP NO. 102 <br /> RIMSMN NO. 0 <br /> uATE atn6m <br /> PAGE 3 OF 11 <br /> ' requirements are specified in the project work plats). This chamber contains scrubbers and <br /> spray nozzles for pressure washing of the CFT probe as it is retrieved from the grouted. In <br /> ' this type of system, all activities are conducted within the enclosed CPT rig. <br /> ' <br /> no standard procedure for conducting strarigtaphic and bydtopolopc investigations is <br /> described below. <br /> 4.3.1 Obtain specifications on the type mad dimensions of the probes and equipment along <br /> with the results of current shop calibrations from the CPT subcontractor. <br /> ' 4.32 With the CPT subcontractor, inspect all equipment to ensure that it is in proper <br /> ' woriing ardor. <br /> 4.3.3 Eucaine dam from adjacent soil borings, if availabie. Initial =Meador of the CPT <br /> data with site lithologies will be accomplished by oumparim with existing boring logs, <br /> geophysical lop, and CPT logs. <br /> ' 4.3.4 Before moving am the site, decontaminate the outside of the rig per SOP 62 and the <br /> project work plans. Far those tip that do not have an automatic decontamination system, the <br /> CPT probe and rods should also be decontaminated per SOP 62. <br /> ' 4.33 Calibrate the CPT cones at zero load reading in air and water. shielding the carte from <br /> direct sunlight heft e commencement of testing at each locadon. <br /> ' 4.3.6 Commence the test and advance the CPT probe into the subsurface at a consistent. <br /> ' controlled ate of 0.03 to 0.07 feet per second (1 to 1 centimeter per second), unless <br /> conditions prevent that rate. <br /> 4.3.7 Record real-time field phm consisting of depth, cone tip resistmtice, sleeve friction <br /> ' resistance, and friction ratio. Poe pressure and differential pore pressure ratio may be <br /> included in some cases. <br /> 1.!7/03.16.9s/oOYr/soP/SGP103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.