My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
2900 - Site Mitigation Program
>
PR0538728
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 2:31:25 PM
Creation date
4/1/2019 10:01:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538728
PE
2950
FACILITY_ID
FA0022234
FACILITY_NAME
ZACKY & SONS POULTRY LLC
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
01
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/14/1995 04:52 9093579307 TJNTO PAGE 08 <br /> ' • SOP NO. 10.2 <br /> REVISION NO. 0 <br /> DATE: COMM <br /> ' PAGE 7 OF 11 <br /> ' 4.4.3 Retrieve the sampler and remove the liners containing the soil. Cover the ends of each <br /> U= to be submitted for chemical analysis with Teflon' film and then cap with plastic end <br /> caps <br /> 4.4.4 Each liner to be submitted for analysis will be appropriately labeled. The label will be <br /> ' filled out using waterproof ink and will contain, at a minimum, the following information: <br /> • Project number <br /> • Sample point (or baring) number <br /> • Bottom depth of liner <br /> ' • Date and time of sample collection <br /> • Parameters for analysis <br /> • Sampler's initials. <br /> ' 4.4.5 As soon as possible after sample callectiM Place the sa nPle in an appropriately aired. <br /> airtight, seam-seating polyethylene bag (e.g., 22plock). Seal the bag, removing any excess air. <br /> ' and tape the bag with custody We so that any attempt to remove the sample win cause the <br /> ' tape to be brdmn. <br /> 4.4.6 Document the sampling event to the Sample Collection Log (Attachment 6.1) or an <br /> ' equivalent form as specified in the project work plans. <br /> ' 4.4.7 Handle the sample according to the procedures outlined in SOP 2.1. For samples <br /> submitted to a laboratory for analysis, an Analysis Request and Chain-of-Custody Record <br /> (Attachment 6.3) shall be completed and maintained per SOP 1.1 and the project work plaits. <br /> ' 4.4.8 Abandon the hole following the procedure outlined in the project wort plana. <br /> ' 4.5 HydrUPnD00 areundVMW 9ampht <br /> The Hydropnoch® sample locations. if carducnd in conjunction with CPT data collection, <br /> will be located a few feet in the estimated upgradient direction from the previous CPT <br /> location. Hydropunch* sampling will be conducted in accordance with the project want <br /> plans. The standard procedure for Hydropunch® sampling is described below. <br /> ' MI/o3-164Na0VTl3OPISOP10.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.