My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
2900 - Site Mitigation Program
>
PR0538728
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 2:31:25 PM
Creation date
4/1/2019 10:01:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538728
PE
2950
FACILITY_ID
FA0022234
FACILITY_NAME
ZACKY & SONS POULTRY LLC
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
01
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09114(1995 04: 52 9093579307 TOHTO PAGE n7 <br /> • • SOP NO. 102 <br /> REVISION NO.0 <br /> ' BATE: M116195 <br /> PAGE 6 OF I 1 <br /> 4.3.8 Pore pressure dissipation tem may be conducted to determine relative flow rates at <br /> specific depths. The CPT probe is held stationary at a given depth and data are recorded for <br /> ' a set time inuaval. The tittle interval is dependent on the lithology of the ZOM being tested. <br /> ' 4.3.9 Once the CPT is pushed w the maximum desired depth, data collection is terminated. <br /> The CPT is retracted from the hole and the tip and rods ase wiped down during extraction. <br /> 4.3.10 Upon completion of a test, calibrate the pkzocone again to zero load reading and <br /> compare this to the initial reading. <br /> ' 4.3.11 Abandon the hole in accordance with the project wort plana. <br /> 4.3.12 All pertinent information observed during the investigations will be recorded by the <br /> rig geologist or engineer. Information will be recorded on the Field Activity Daily Log <br /> (FADL) (Attachment 6.1) and/or appropriate form(s) as specified in the project wart plans. <br /> Any and all problems or unusual conditions encountered should also be noted an the above <br /> forms and brought to the attention of the site superinteadem. <br /> 4.4 SOI/ SARW" <br /> if required. soil sampling will follow the CPT analysis rum. Soil sampling loittiors will be <br /> ' placed updip relative to the location of the previous CPT testing run The standard procedure <br /> is described below. <br /> ' 4.4.1 Assemble and check the nemsary sampling eq»ipmert before soil sampling. <br /> Decontaminate all downhole sampling equipment before sampling. as described in SOP 6.1. <br /> ' The rig should also be decontaminaW per SOP 62. <br /> ' 4.42 Deploy and advance the soil sampling probes with the CFT rods to collect soil samples <br /> at the sample intervals specified in the project work plans. The sample intervals may be <br /> identified from the adjacent CPT dam and any other subsurface data available. The sampling <br /> device contains removable liners that fit inside the drive tip mechanism. <br /> mZ'M.I69ypOvrf3tlij3MO2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.