Laserfiche WebLink
Mo <br /> m o. 250 <br /> Blq <br /> —� AgpENDIX E: WELL CONSTRUCTION SPECIFICATIONS (continued) <br /> All wells will 'be deveioped by surge pumping until clear water is <br /> recovered. Surge pumping will continue until clear water is obtainer <br /> f on three consecutive cycles of cleaning. The well will then be <br /> u continuously pumped for one hour. All new wells will be logged. <br /> q <br /> Dirt recovered during the drilling operation will be stockpiled on ai <br /> impermeable surface on site, covered with an impermeable top and hell` <br /> r <br /> pending chemical analyses. The appropriate disposal method will their <br /> ri <br /> be use. <br /> New wells will be allowed to stabilize .fora approximately ely one week { <br /> before sampling, <br /> 3 <br /> Prepared by: <br /> David E. Ellis , <br /> tit <br /> ProfeetManager. <br /> Approved by: <br /> Judith <br /> A. Kron <br /> A a <br /> ( <br /> z <br /> Quality As Officer <br /> 14 <br /> Bull <br /> 4.. <br /> E, <br />