My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012746
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
ARCHIVED REPORTS XR0012746
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:10:17 PM
Creation date
4/2/2019 3:36:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012746
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> � A <br /> C <br /> APPEmDIX F: PuNp TFSTI1if, PRQTOCDl.S <br /> S i <br /> Aquifer pump tests will be <br /> performed an selected wells, <br /> in a well not expected to be influenced b Water lev <br /> measured for two days Y the pump tests will be <br /> Y immediately before the PUMP tests are conduct <br /> The day before the actual DUMP testing, stepped drawdown <br /> tests wild <br /> run to evaluate the efficiency and maximum flow rate of each well <br /> the most appropriate <br /> Pumping P g. rate for the tests. The step tests w'' <br /> y consist of pumping at an initial rate of <br /> 2' GPM' for at .least ane-ha' <br /> hour, and then increasing the pumping rate in uniform increments <br /> half-hour `,ntervals. Atmospheric pressure data may be collected o` <br /> r <br /> site during the period Of well testing to help evaluate t <br /> efficiency , . he Isar <br /> .of the:.aquifers <br /> }. ome• <br /> c Drawdown in the 'pumping well will be recorded at the selected t' <br /> Y•, <br /> r . i m <br /> alei <br /> 1�w predicting the maximum allowable test duration for each <br /> corresponding pumping rate. Pump tests will consist of a <br /> peNad, and r Pumping <br /> ecovery data will be collected until 901; of the.. drawd.j <br /> een ' <br /> x .. has b . recovered. Pumping <br /> rates will be selected bated on. the <br /> information collected from the stepped drawdown tests that a maxim, <br /> raaius of influence can be achieved with maximum a , i <br /> Within 12 ?losable drawdown <br /> 24 hours of pumping, <br />
The URL can be used to link to this page
Your browser does not support the video tag.