Laserfiche WebLink
• • Page 1 of 1 <br /> Nuel Henderson [EH] <br /> From: Nuel Henderson [EHJ <br /> Sent: Friday, January 11, 2013 11:31 AM <br /> To: 'todd.hafner@cardno.com' <br /> Cc: 'Barton, Jim@Waterboards';Adrienne Ellsaesser[EH] <br /> Subject: RE: Monitoring Well Destruction <br /> Todd, <br /> I've reviewed the groundwater data and a limited amount of soil data to address your request.Assuming <br /> that there is no impacted soil in the vicinity of the wells, a can agree to pressure grouting JLM-4, 12, 14, <br /> 15, 16, 17, 18, 19, 24, and 25. JLM-20 and JLM-26 each have impacted groundwater and must have the <br /> well contents removed. Your proposal to overdrill JLM-3, 5, 13, 21, 22 and 23 is acceptable. Please verify <br /> that soil in the areas of wells proposed for pressure grouting is not impacted in your work plan. <br /> Nuel Henderson <br /> From:Todd Hafner [mailto:todd.hafner@cardno.com] <br /> Sent:Thursday,January 10, 2013 5:34 PM <br /> To: Nuel Henderson [EH] <br /> Cc: John Yoakum [EH] <br /> Subject: Monitoring Well Destruction <br /> Hi Nuel, <br /> I am in the process of preparing a well destruction workplan at the request of Jim Barton for J&L Market <br /> located at 8125 South EI Dorado Street in French Camp and would like your recommendation/approval with <br /> regard to destruction methodology before it is submitted. Eighteen monitoring wells and two ozone sparge <br /> wells associated with the site will be destroyed. The monitoring wells are installed to depths ranging from <br /> approximately 36.5 to 140.6 feet, and the ozone sparge wells are each installed to a depth of approximately <br /> 35 feet. Seven monitoring wells are installed inside steel conductor casing.The conductor casing was <br /> installed to depths ranging from approximately 57 to 96.5 feet. <br /> In an effort to reduce costs, I am proposing to destroy wells JLM4,JLM12, JLM14,JI-Ml 5,JLM16,JLM17, <br /> JLM18, JLM19, JLM20,JLM24,JLM25, and JLM26 by pressure grouting and destroying JLM3,JLM5, <br /> JLM13, JLM21, JLM22,JLM23,and the two ozone sparge wells by overdrilling.The vast majority of <br /> impacted soil was removed prior to the installation of all but three monitoring wells.Attached is a table of <br /> groundwater quality data associated with the wells. Please let me know if my proposed approach is <br /> acceptable. Mr. Barton would like to review the completed workplan next week. Let me know if you have any <br /> questions. <br /> Todd Hafner, P.G. <br /> SENIOR GEOLOGIST <br /> CARDNO ATC <br /> Cardno` <br /> ATC <br /> Shaping the Future <br /> Phone(+1)209-579-2221 Fax(+1)209-579-2225 Mobile(+1)209-662-0899 <br /> Address 1117 Lone Palm Avenue, Suite B, Modesto, CA 95351 <br /> Email todd.hafner@cardno.com Web www.cardnoatc.com-www.cardno.com <br /> This email and its attachments may contain confidential and/or privileged information for the sole use of the intended recipient(s). <br /> Al electronically supplied data must be checked against an applicable hardcopy version which shall be the only document which <br /> Cardno warrants accuracy.If you are not the intended recipient,any use,distribution or copying of the information contained in <br /> this email and its attachments is strictly prohibited.If you have received this email in error,please email the sender by replying to <br /> this message and immediately delete and destroy any copies of this email and any attachments.The views or opinions expressed <br /> are the author's own and may not reflect the views or opinions of Cardno. <br /> 1/29/2013 <br />