Laserfiche WebLink
RESNA <br /> SITE SAFETY PLAN <br /> On-site communications- ❑ Radio 19 Verbal ❑ Hand Signals <br /> ❑ Other On-site mobile phone <br /> Designate hand signals here: <br /> 1 <br /> Off-site communications: ❑ Radio a Telephone <br />' ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbal/ Given <br /> Evacuation assembly point is Upwind from emergency <br /> MARK EVACUATION ROUTE(S) ON SITE MAP ❑ CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> 0 <br /> Personnel Decontamination Procedure All contaminated i3ersonnel clothing ie gloves.coveralls <br /> will be cleaned and/or 12roverly dis osed of <br /> Location of 7,011et: Inside site facility <br /> Location of Drinking Water Inside site facilit <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN DONE <br /> Equipment Decontamination Procedure- Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> IMaterials to be Disposed of as Hazardous Waste- All soil and waterp roduced will be stored on- <br /> site until appropriate disposal methods are <br /> determined. <br /> PAGES <br />