Laserfiche WebLink
RESNA <br /> SITE SAFETY PLAN <br />' Physical Hazards <br />' Task(s) Hazard Mitigabon Measure <br /> 1 Heavy Equipment (Noise & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in <br /> accordance with recognized indust ry standards <br /> and Cal-OSHA Title 8,Subchapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone applies to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> Au equipment operators and ground dews <br /> working in dose proximity of hearty equipment <br /> will be supplied with ear protection. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials <br /> Flammable {Flash Point C900 QF) Combustible (Flash Point <200 OF) <br />' Gasoline Diesel <br /> Type and Location of Fre Extinguishers Maw on map for large projectsl <br />' Dry chemical fire extinguisher (Class A, B, and C) stored ,n RESNA vehicles <br />' Other Hazards (Check if applicable) <br /> 0 Noise Activities likely to generate noise exceeding 85 dB <br />' Wear hearing protection during these activities <br />' PAGE 4 <br /> 1 i <br />